<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />

Double sided tape or contact adhesives can be used to hold insulation in place while the roof sheets are<br />

being installed. Trim excess insulation to the edge of the eave trim and cut fi berglass approximately 4<br />

inches from end leaving only facing. Fold facing over end of blanket insulation to seal the ends.<br />

NOTE:<br />

Double sided tape and patching tape are supplied by erectors!<br />

EAVE TRIM<br />

SHAPE MAY VARY<br />

#14 SELF-TAPPING<br />

WALL FASTENER<br />

1 1/2”<br />

(ALLOW ROOM TO INSTALL<br />

MASTIC <strong>AND</strong> CLOSURE STRIP)<br />

CUT FIBER GLASS FROM VAPOR BARRIER <strong>AND</strong><br />

FOLD VAPOR BARRIER OVER<br />

DOUBLE SIDED TAPE<br />

(NOT BY RIGID)<br />

BLANKET INSULATION<br />

OUTSIDE CLOSURE<br />

EAVE STRUT<br />

NOTE:<br />

Do not install more insulation on the roof than can be covered<br />

by roof panels before the work period ends. Do not allow the<br />

insulation to become wet. Safety fi rst!<br />

Technical information contained herein is subject to change without notice. Page 7.1-55<br />

Revision: 2<br />

April 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!