Double sided tape or contact adhesives can be used to hold insulation in place while the roof sheets are<br />
being installed. Trim excess insulation to the edge of the eave trim and cut fi berglass approximately 4<br />
inches from end leaving only facing. Fold facing over end of blanket insulation to seal the ends.<br />
NOTE:<br />
Double sided tape and patching tape are supplied by erectors!<br />
EAVE TRIM<br />
SHAPE MAY VARY<br />
#14 SELF-TAPPING<br />
WALL FASTENER<br />
1 1/2”<br />
(ALLOW ROOM TO INSTALL<br />
MASTIC <strong>AND</strong> CLOSURE STRIP)<br />
CUT FIBER GLASS FROM VAPOR BARRIER <strong>AND</strong><br />
FOLD VAPOR BARRIER OVER<br />
DOUBLE SIDED TAPE<br />
(NOT BY RIGID)<br />
BLANKET INSULATION<br />
OUTSIDE CLOSURE<br />
EAVE STRUT<br />
NOTE:<br />
Do not install more insulation on the roof than can be covered<br />
by roof panels before the work period ends. Do not allow the<br />
insulation to become wet. Safety fi rst!<br />
Technical information contained herein is subject to change without notice. Page 7.1-55<br />