ERECTION AND SAFETY MANUAL - Rigid Global Buildings
ERECTION AND SAFETY MANUAL - Rigid Global Buildings
ERECTION AND SAFETY MANUAL - Rigid Global Buildings
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6.3 FLASHING CAULK <strong>AND</strong> LAP DETAILS<br />
Page 7.1-78<br />
Revision: 2<br />
August 2011<br />
2” Lap<br />
(6) 1/8” Pop Rivets<br />
Tape Sealant<br />
<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />
1”<br />
(4) 1/8” Pop Rivets<br />
NOTE:<br />
RIGID manufactures a wide variety of fl ashing confi gurations. The examples shown are meant<br />
to impress upon the erector the importance of sealants and fasteners at fl ashing laps. Consult<br />
RIGID for any questionable details. <strong>SAFETY</strong> FIRST!<br />
2” Lap<br />
EAVE TRIM TRANSITION TRIM<br />
2” Lap<br />
(6) 1/8” Pop Rivets<br />
“AW” PANEL CORNER TRIM “R” PANEL CORNER TRIM<br />
Roof Fasteners<br />
Tape Sealant<br />
2” Lap<br />
Technical information contained herein is subject to change without notice.