26.03.2013 Views

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6.3 FLASHING CAULK <strong>AND</strong> LAP DETAILS<br />

Page 7.1-78<br />

Revision: 2<br />

August 2011<br />

2” Lap<br />

(6) 1/8” Pop Rivets<br />

Tape Sealant<br />

<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />

1”<br />

(4) 1/8” Pop Rivets<br />

NOTE:<br />

RIGID manufactures a wide variety of fl ashing confi gurations. The examples shown are meant<br />

to impress upon the erector the importance of sealants and fasteners at fl ashing laps. Consult<br />

RIGID for any questionable details. <strong>SAFETY</strong> FIRST!<br />

2” Lap<br />

EAVE TRIM TRANSITION TRIM<br />

2” Lap<br />

(6) 1/8” Pop Rivets<br />

“AW” PANEL CORNER TRIM “R” PANEL CORNER TRIM<br />

Roof Fasteners<br />

Tape Sealant<br />

2” Lap<br />

Technical information contained herein is subject to change without notice.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!