<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />

5.12 PREPARING THE EAVE<br />

After installing the fi rst run of insulation, prepare the eave for the fi rst roof panel by applying tape sealant along<br />

the eave outside of the insulation and leaving release paper in place. Sealant must be applied in a straight<br />

line and without voids. Do not stretch the sealant. Use a knife to cut if necessary. Cut an inside closure strip<br />

as shown and place starter piece on top of the sealant (removing protective paper from the sealant only as<br />

required). Align the major rib of the closure with the edge of the endwall roof line. Splice a full closure to the<br />

starting closure and apply along the top of the eave sealant. If roof is subject to ice and snow build-up, the<br />

splice in the closure strip must be caulked to insure weathertightness.<br />

BLANKET<br />

INSULATION<br />

EAVE STRUT<br />

STARTER<br />

PANEL EDGE<br />

DOUBLE<br />

SIDED TAPE<br />

SEALANT<br />

SIMPLE<br />

EAVE TRIM<br />

FULL INSIDE<br />

CLOSURE<br />

WALL PANEL<br />

NOTE:<br />

Insulation has no load bearing strength. Maintain body weight on approved<br />

scaffolding or walk boards. Safety First!<br />

ONE HALF INSIDE CLO-<br />

SURE<br />

Technical information contained herein is subject to change without notice. Page 7.1-61<br />

Revision: 2<br />

April 2011<br />

CUT