5.12 PREPARING THE EAVE<br />
After installing the fi rst run of insulation, prepare the eave for the fi rst roof panel by applying tape sealant along<br />
the eave outside of the insulation and leaving release paper in place. Sealant must be applied in a straight<br />
line and without voids. Do not stretch the sealant. Use a knife to cut if necessary. Cut an inside closure strip<br />
as shown and place starter piece on top of the sealant (removing protective paper from the sealant only as<br />
required). Align the major rib of the closure with the edge of the endwall roof line. Splice a full closure to the<br />
starting closure and apply along the top of the eave sealant. If roof is subject to ice and snow build-up, the<br />
splice in the closure strip must be caulked to insure weathertightness.<br />
BLANKET<br />
INSULATION<br />
EAVE STRUT<br />
STARTER<br />
PANEL EDGE<br />
DOUBLE<br />
SIDED TAPE<br />
SEALANT<br />
SIMPLE<br />
EAVE TRIM<br />
FULL INSIDE<br />
CLOSURE<br />
WALL PANEL<br />
NOTE:<br />
Insulation has no load bearing strength. Maintain body weight on approved<br />
scaffolding or walk boards. Safety First!<br />
ONE HALF INSIDE CLO-<br />
SURE<br />