ERECTION AND SAFETY MANUAL - Rigid Global Buildings
ERECTION AND SAFETY MANUAL - Rigid Global Buildings
ERECTION AND SAFETY MANUAL - Rigid Global Buildings
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />
5.16 SEALING THE ENDLAPS<br />
At the panel endlaps place a run of tape sealant across the full panel width 1/2” below the fastener line.<br />
The panel endlaps have a 6” minimum overlap located over a purlin as shown. Locate the fasteners 1<br />
above the purlin web according to the fastener layout.<br />
RIDGE<br />
ROOF PANEL<br />
6” LAP<br />
PURLIN<br />
PURLIN WEB<br />
ROOF FASTENER<br />
SEE BLDG. DRAWINGS<br />
FOR DIMENSIONS<br />
TAPE SEALANT<br />
EAVE<br />
NOTE:<br />
Do not step on panel endlaps until fully secured with fasteners<br />
Safety First!<br />
Technical information contained herein is subject to change without notice. Page 7.1-67<br />
Revision: 2<br />
April 2011