ERECTION AND SAFETY MANUAL - Rigid Global Buildings
ERECTION AND SAFETY MANUAL - Rigid Global Buildings
ERECTION AND SAFETY MANUAL - Rigid Global Buildings
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />
5.1 GENERAL INFORMATION<br />
All the primary and secondary framing should be erected, plumbed and the bolts properly tightened before<br />
the sheeting of the building is started. Framed openings should also be installed, plumbed, squared and<br />
tightened before sheeting begins.<br />
RIGID’s wall and roof panels are quality merchandise and should be handled with care. When unpacking<br />
panels, pick them up and apart; never slide one panel over another. When lifting panels, support long<br />
panels to prevent buckling.<br />
This section contains erection instructions for exposed fastener metal panels only.<br />
RIGID<br />
FRAME<br />
CABLE<br />
BRACE<br />
5.0 SHEETING<br />
SQUARE<br />
SQUARE<br />
NOTE:<br />
Workers should always use gloves when lifting sheets and follow all OSHA safety<br />
recommendations. Safety fi rst!<br />
Technical information contained herein is subject to change without notice. Page 7.1-43<br />
Revision: 2<br />
April 2011