26.03.2013 Views

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />

5.1 GENERAL INFORMATION<br />

All the primary and secondary framing should be erected, plumbed and the bolts properly tightened before<br />

the sheeting of the building is started. Framed openings should also be installed, plumbed, squared and<br />

tightened before sheeting begins.<br />

RIGID’s wall and roof panels are quality merchandise and should be handled with care. When unpacking<br />

panels, pick them up and apart; never slide one panel over another. When lifting panels, support long<br />

panels to prevent buckling.<br />

This section contains erection instructions for exposed fastener metal panels only.<br />

RIGID<br />

FRAME<br />

CABLE<br />

BRACE<br />

5.0 SHEETING<br />

SQUARE<br />

SQUARE<br />

NOTE:<br />

Workers should always use gloves when lifting sheets and follow all OSHA safety<br />

recommendations. Safety fi rst!<br />

Technical information contained herein is subject to change without notice. Page 7.1-43<br />

Revision: 2<br />

April 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!