5.19 INSTALLATION OF ROOF PANELS<br />

Page 7.1-70<br />

Revision: 2<br />

August 2011<br />

<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />

With the fi rst panel run installed and secured, and sidelap sealant applied, the second panel run may be<br />

started. Prepare the eave with an inside closure and tape sealant as shown previously. Position the panel<br />

so that the overlapping ribs will nest properly. Be sure to check for proper overhang and panel coverage.<br />

Stitch the major ribs of the two panels together, and fasten panel to the purlins.<br />

BLANKET<br />

INSULATION<br />

EAVE<br />

STRUT<br />

DOUBLE<br />

SIDED TAPE<br />

EAVE FLASHING<br />

TAPE SEALANT<br />

WALL PANEL<br />

NOTE:<br />

Sweep up all drill shavings from panels at end of each work period<br />

to avoid surface rust and damage to panel fi nish.<br />

Technical information contained herein is subject to change without notice.