26.03.2013 Views

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />

Good alignment of the screws, especially on the wall panels, will give a professional appearance to the<br />

wall panel installation. One way this can be accomplished is by pre-drilling holes in the panels at identical<br />

locations. Up to 15 panels can be stacked together and drilled using a template panel. Use 1/8” or 3/32”<br />

diameter drill bit for panel to structural fasteners and a 1/4” diameter bit for the sidelap clearance holes.<br />

It is important to clean metal fi lings off panel surfaces after drilling to avoid rust stains.<br />

PRE-DRILLED<br />

TEMPLATE SHEET<br />

STACKED SHEETS<br />

TO BE DRILLED<br />

SCREW ALIGNMENT<br />

KEEP ENDS OF<br />

PANEL ALIGNED<br />

NOTE:<br />

Use OSHA approved eye protection when operating a drill. Electrical tools must be properly<br />

grounded. Do not use electrical tools or equipment while standing on wet surfaces. Safety fi rst!<br />

Technical information contained herein is subject to change without notice. Page 7.1-49<br />

Revision: 2<br />

April 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!