10.16.2 Environmental impacts <strong>of</strong> dams and other works*<br />
The Department <strong>of</strong> Water Affairs and Forestry insists on an Environmental Impact<br />
Assessment (EIA) <strong>of</strong> all major water projects undertaken by, or on behalf <strong>of</strong> the<br />
Department. Public disclosure <strong>of</strong> all major projects is required in terms <strong>of</strong> Section 58 <strong>of</strong><br />
the Water Act No. 54 <strong>of</strong> 1956. Accordingly, a report on the proposed works must be<br />
tabled as a Parliamentary White Paper (see Chapter 21. Recommendations that arise from<br />
EIAs are outlined in the White Papers and are implemented during the design, construction,<br />
operation (and decommissioning) phases <strong>of</strong> a project. Environmental Impact Assessments<br />
may be undertaken by staff <strong>of</strong> the Department, or via an environmental committee drawn<br />
from a wide range <strong>of</strong> expertise in both the private and public sectors.<br />
In NatallKwaZulu, the Drakensberg Pumped Storage Scheme** and the Mfolozi River<br />
Basin Project for example, have both been subject to EIAs. Environmental issues<br />
considered in EIAs vary from project to project, where both beneficial and negative<br />
environmental effects are examined. Short term landscape planning and site restoration<br />
measures* * *, plus longer term implications (such as the release <strong>of</strong> water to maintain<br />
riverine or estuarine ecology), are important factors in the analysis <strong>of</strong> dam construction<br />
projects* * * * . The environmental effects usually studied may be grouped according<br />
to their impact on man (socio-economic parametersl, as well as geophysical aspects,<br />
water, climate, flora and fauna. The impactsthatvarious engineering activities (associated<br />
with major water projectsl, have on the environment are shown in simplified matrix form<br />
*<br />
**<br />
***<br />
****<br />
Discussion based on Anonymous, 1986. Management <strong>of</strong> the Water Resources <strong>of</strong> the Republic <strong>of</strong><br />
South Africa, Department <strong>of</strong> Water Affairs, Pretoria, various pages. See also, Roberts, C.P.R., 1981.<br />
Environmental considerations <strong>of</strong> water projects, In: Hattingh, W.H.J. (ed), Water Year + 10 and<br />
Then?, Technical Report No. TR 114, Department <strong>of</strong> Water Affairs, Forestry and Environmental<br />
Conservation, Pretoria, p. 106 - 123., as well as the section on The conservation status <strong>of</strong> South<br />
African rivers in the chapter on water quality.<br />
See Roberts, C.P.R. and Erasmus, J.J., 1982. Environmental considerations <strong>of</strong> the Drakensberg<br />
Pumped Storage Scheme, Civil Engineer in South Africa, VOl 24(81, p. 361 - 373, 455.<br />
See Anonymous, 1986. Completion report: landscape rehabilitation <strong>of</strong> the Drakensberg Pumped<br />
Storage Scheme, Report No. VNl 00/18/E005, Department <strong>of</strong> Water Affairs, Pretoria, 35 p. + app.,<br />
as well as Prior, E.E., 1984. Towards successful grassing <strong>of</strong> civil engineering projects, Civil Engineer<br />
in South Africa, VOl26(1 01, p.491 - 493. (8rief overview details (including environmental aspects),<br />
<strong>of</strong> several <strong>of</strong> the larger darns in South Africa, can be found in a series <strong>of</strong> pamphlets available from the<br />
Department <strong>of</strong> Water Affairs and Forestry. Example: lnanda Darn - Mgeni River Govemment Water<br />
Scheme).<br />
See Anonymous, 1987. Towards establishing the potential environmental impact <strong>of</strong> the proposed<br />
KwaMshaya Dam, Environmental Advisory Services, Durban, 22 p. + app.