<strong>Oak</strong> <strong>Ridge</strong> <strong>Reservation</strong><br />

Laboratories conducting radiological and non-radiological analyses for ETTP environmental<br />

monitoring programs are reviewed periodically by the SMO to ensure that the quality of the analytical<br />

work continues to meet the appropriate standards. Laboratories used by ETTP must be approved by the<br />

Department of Energy Analytical Services Program (<strong>DOE</strong>CAP Audit Team), which conducts routine<br />

audits (at least once per year, and more frequently if a problem is noted) to ensure that the analyses are of<br />

the highest quality.<br />

When data is received from the laboratory, the SMO reviews the data package from the laboratory.<br />

Data completeness, quantitation levels, screening levels, holding times, and methodology are examined to<br />

ensure that all quality aspects of the analyses meet the criteria set forth in the S&A plan and the SOW.<br />

Any deficiencies are noted and the laboratory is contacted for clarification. When the SMO is satisfied<br />

that the data is complete and meets all criteria, the data is forwarded to the SME. The SME conducts<br />

further reviews, and uses the data in the appropriate calculations and reports.<br />

Selected programs or projects impose unique QA requirements on their activities. Such special QA<br />

Program requirements are added to, and where possible, integrated with the basic BJC QA Program<br />

requirements for the affected facilities and activities. For subcontracted work, the necessary QA<br />

requirements are included in subcontract language, or the subcontractor is required to develop a QA plan<br />

to be submitted to BJC for review and approval. These special QA requirements are applicable to a<br />

specific work scope and are monitored by BJC and/or subcontractor personnel, as appropriate.<br />

3.7.1. Integrated Assessment and Oversight Program<br />

QA Program implementation and procedural and subcontract compliance are verified through the<br />

BJC Integrated Assessment and Oversight Program. The program identifies the processes for planning,<br />

conducting, and coordinating assessment and oversight of BJC activities, including both self-performed<br />

and subcontracted activities, resulting in an integrated assessment and oversight process. The program is<br />

composed of three key elements: (1) external assessments conducted by organizations external to BJC, (2)<br />

independent assessments conducted by teams independently of the project/function being assessed, and<br />

(3) management assessments conducted as self-assessments by the organization or on behalf of the<br />

organization manager.<br />

Self-assessments are performed by the organization/function having primary responsibility for the<br />

work, process, or system being assessed. Organizations and functions within the company plan and<br />

schedule self-assessments. Self-assessments encompass both formal and informal assessments. The<br />

formal self-assessments include management assessments and subcontractor oversight. Informal selfassessments<br />

include weekly inspections and routine walkthroughs conducted by subcontractor<br />

coordinators, ES&H representatives, quality engineers, and line managers.<br />

QA issues identified from internal and external assessments are documented, causal analyses are<br />

performed, and corrective actions are developed and tracked to closure. Analyses are conducted<br />

periodically to identify trends for management action. Data from those processes are evaluated by senior<br />

management to identify opportunities for improvement.<br />

3.8 <strong>Environmental</strong> Management Activities<br />

3.8.1 Waste Management Activities<br />

Restoration of the environment, D&D of facilities, and management of the legacy wastes constitute<br />

the major operations at ETTP.<br />

The ETTP is home to the TSCA Incinerator, a thermal treatment facility. It was one of the few<br />

facilities licensed to incinerate both PCB waste and radioactive mixed waste. The TSCA Incinerator<br />

treated waste from all across the <strong>DOE</strong> complex and as such was a key component of <strong>DOE</strong> remediation<br />

efforts across the nation. The incinerator treated approximately 2.2 million lbs of waste in 2009<br />

(2,066,050 lbs of liquid waste and 119,203 lbs of solid waste). On December 2, 2009, waste treatment<br />

operations ceased at the incinerator, and the facility entered the decontamination and decommissioning<br />

3-78 East Tennessee Technology Park