05.06.2013 Views

DOE/ORO/2327 Oak Ridge Reservation Annual Site Environmental ...

DOE/ORO/2327 Oak Ridge Reservation Annual Site Environmental ...

DOE/ORO/2327 Oak Ridge Reservation Annual Site Environmental ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Annual</strong> <strong>Site</strong> <strong>Environmental</strong> Report<br />

addition, the new plant will require less water and fewer chemicals because it uses reverse osmosis<br />

for water purification. As of the end of December, the project is 95% complete overall and on track to<br />

turn over the new plant to Operations in the spring of 2010.<br />

• Complex Command Center—Building on the success of the Jack Case and New Hope centers, Y-12<br />

is moving forward with plans for an additional third-party-financed facility. The Complex Command<br />

Center (CCC) will consolidate Y-12’s emergency services within Y-12’s Property Protected Area.<br />

The proposed CCC will house the fire department, the plant shift superintendent’s office, the<br />

technical support/emergency operations center, and emergency management support. These functions<br />

are now scattered throughout the site in aging, outmoded facilities. The project has registered with the<br />

United States Green Building Council (USGBC) and is working towards achieving a Leadership in<br />

Energy and <strong>Environmental</strong> Design (LEED) Silver rating, and quite possibly Gold, depending on how<br />

many points are ultimately accepted post-occupancy by USGBC.<br />

• Uranium Process Facility (UPF)—The UPF (Fig. 4.2), cornerstone of Y-12’s modernization<br />

strategy, is proposed to replace current enriched uranium and other processing operations. This<br />

involves a new, fully modernized manufacturing facility optimized for safety, security, and<br />

efficiency. It would be the only facility of its type in the United States.<br />

Fig. 4.2. Uranium Process Facility conceptual image.<br />

4.2 <strong>Environmental</strong> Management System<br />

As part of B&W Y-12’s commitment to environmentally responsible operations, Y-12 has<br />

implemented an environmental management system (EMS) based on the rigorous requirements of the<br />

globally recognized International Organization for Standardization (ISO) 14001-2004 (ISO 2004).<br />

4.2.1 Integration with Integrated Safety Management System<br />

The Integrated Safety Management System (ISMS) is the <strong>DOE</strong>’s umbrella of environment, safety,<br />

and health (ES&H) programs and systems that provides the necessary structure for any work activity that<br />

could potentially affect the public, a worker, or the environment. B&W Y-12’s ISMS has incorporated the<br />

elements of the ISO 14001 EMS in the overall umbrella of ISMS for environmental compliance, pollution<br />

The Y-12 National Security Complex 4-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!