05.06.2013 Views

DOE/ORO/2327 Oak Ridge Reservation Annual Site Environmental ...

DOE/ORO/2327 Oak Ridge Reservation Annual Site Environmental ...

DOE/ORO/2327 Oak Ridge Reservation Annual Site Environmental ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Oak</strong> <strong>Ridge</strong> <strong>Reservation</strong><br />

1,000,000 ft 2 of new and renovated space has been constructed (see Fig. 5.4). The average age of ORNL<br />

facilities has decreased from 42 to 31 years. A combination of federal, state, and private financing has<br />

supported the construction of the new facilities (see Table 5.1).<br />

Building<br />

number<br />

5-8 <strong>Oak</strong> <strong>Ridge</strong> National Laboratory<br />

Fig. 5.4. Modernization and facilities revitalization.<br />

Table 5.1. ORNL facilities constructed since 2000<br />

Building name<br />

Funding<br />

source<br />

1521 West End Research Support Facility <strong>DOE</strong><br />

7990 Melton Valley Warehouse <strong>DOE</strong><br />

1060 <strong>Environmental</strong> and Life Sciences Laboratory <strong>DOE</strong><br />

7972 Small-Angle Neutron Scattering Guide Hall Extension <strong>DOE</strong><br />

1005 Laboratory for Comparative and Functional Genomics <strong>DOE</strong><br />

7625 Multiprogram High Bay Facility <strong>DOE</strong><br />

3625 Advanced Materials Characterization Laboratory <strong>DOE</strong><br />

5200 Research Support Center <strong>DOE</strong><br />

8610 Center for Nanophase Materials Sciences <strong>DOE</strong><br />

NTRC National Transportation Research Center Private<br />

5600 Computational Science Building Private<br />

5800 Engineering Technology Facility Private<br />

5700 Research Office Building Private<br />

5300 Multiprogram Research Facility Private<br />

5100 Joint Institute for Computational Sciences & <strong>Oak</strong> <strong>Ridge</strong><br />

Center for Advanced Technologies<br />

State<br />

1520 Joint Institute for Biological Sciences State<br />

7880 TRU Waste Process Building <strong>DOE</strong><br />

7880A Contact-Handled Staging Area Building <strong>DOE</strong><br />

7880B Personnel Support Building <strong>DOE</strong><br />

7880HH Macroencapsulation Building <strong>DOE</strong><br />

7880BB Contact-Handled Marshalling Building <strong>DOE</strong><br />

7880AA Drum Venting Building <strong>DOE</strong><br />

During FY 2009, modernization and revitalization efforts at ORNL provided new facilities, enhanced<br />

staff interaction and space utilization, upgraded utility systems, and demolished old, expensive-tomaintain<br />

facilities. During the year, ORNL expended approximately $7 million to decrease the backlog of<br />

deferred maintenance in mission-critical facilities, to vacate substandard facilities, and to improve quality<br />

of remaining facilities.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!