05.06.2013 Views

DOE/ORO/2327 Oak Ridge Reservation Annual Site Environmental ...

DOE/ORO/2327 Oak Ridge Reservation Annual Site Environmental ...

DOE/ORO/2327 Oak Ridge Reservation Annual Site Environmental ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Annual</strong> <strong>Site</strong> <strong>Environmental</strong> Report<br />

Fig. 5.46. Groundwater monitoring locations at the Spallation Neutron Source, 2009.<br />

14 C analyses. Additionally, samples were collected during wet season base flow conditions for gross<br />

activity (alpha and beta) and for selected gamma spectroscopic parameters.<br />

SNS <strong>Site</strong> Results<br />

Sampling at the SNS site occurred during March, June, September, and November 2009, and the<br />

sampling results were compared to reference standards. Gross alpha activity was detected above the<br />

applicable reference standard in the base flow sample collected from S-5 in March 2009. No other SNS<br />

sample results exceeded reference standard values in 2009. Low concentrations of gross alpha activity<br />

were detected in samples collected from S-1 and SW-1 during base flow conditions in March. In addition,<br />

low concentrations of gross beta activity were detected in samples collected from S-2 and S-5 during base<br />

flow conditions in March 2009. Carbon-14 was detected in a sample collected during base flow condition<br />

at monitoring point S-4 in March 2009. Low concentrations of 3 H were detected numerous times during<br />

2009. The following is a summary of the locations, flow conditions, and dates for the 3 H detections.<br />

1. S-1 – (a) during falling limb flow conditions in March; (b) during base flow, rising limb, and falling<br />

limb flow conditions in September; and c) during rising limb flow conditions in November<br />

2. S-2 – (a) during base flow, rising limb, and falling limb flow conditions in September and (b) during<br />

rising limb flow conditions in November<br />

3. S-4 – during rising limb flow conditions in November<br />

4. S-5 – (a) during base flow and rising limb flow conditions in September and (b) during rising limb<br />

flow conditions in November<br />

5. SW-1 – during rising limb flow conditions in September and November<br />

<strong>Oak</strong> <strong>Ridge</strong> National Laboratory 5-81

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!