I Case 2:10-cv-O7678-JFW-DTB Document 57-15 Filed 09/28/11 Page 1 of 1<br />

#: 1059<br />

I FUTURELOGIC Inc. r<br />

I<br />

TO: James Co.<br />

Davis, The Coca-Cola<br />

Simi Ahluwalia, The Coca-Cola Co.<br />

Ken Weinaug, The Coca-Cola Co.<br />

I Jodi Hildenbrand, The Coca-Cola Co.<br />

CC: Dave Uland, Interleave Systems<br />

Linda Brass, Voxcom<br />

I DT: 05/18199<br />

RE: Finalized cost reductions and clarification_ _ _ ._<br />

Thank you all for your patience while we reviewe( reviewed the _e valious various asl: aspects e of )f tthe<br />

proposed<br />

I printer. I have summarized our cost reduction fin_ findings Lgs below, ant and iin addition, Idit I am<br />

providing clarification on several of the points thai that were ere ddiscussed scussed iin the_ nmeeting<br />

and in the<br />

earlier submitted quotation.<br />

I As<br />

As<br />

a<br />

first<br />

first<br />

point<br />

point<br />

of<br />

of<br />

clarification,<br />

clarification,<br />

I<br />

would<br />

would<br />

like<br />

like<br />

to<br />

to<br />

point<br />

point out<br />

Jttha'<br />

that<br />

the<br />

the<br />

apl:<br />

approach<br />

r( [th<br />

that we took in<br />

complying with section 9.4.3, of the CCUSA Coui Coupon 1Prin Printer er Spec Specification, fi )n, was to provide a<br />

removable/reusable packaging that would provide the necessary cushioning for each<br />

I removable/reusable printer while in transit. packaging Once at that the installation would provide sit site, le the theneq_ssary,'L c_shionin!l cushioning would)nin ld Ibe<br />

removed, the<br />

printer installed, and the replaced printer outfitted outfitted, with rith th._ the same _;t cushion, )n, for the return trip.<br />

The benefits ofthis of this approach are a reduced cost burden rden inn the prin printer (already aln accounted<br />

I<br />

• for in existing quotation) and the ability to meet the size constraints of section 9.1.4. This<br />

" for in existing quotation) and the ability to meet th size c _nstrainls ec<br />

assumed solution has also been factored into the option )tion list show shown1 below, Iw, and would<br />

impact both size and cost in a negative way if the approach )proa :h was ¢e deemed;d iinadequate.<br />

I Another point of clarification that I think needs mentioning is the ppapedmedia a me width. At the<br />

beginning of the discussions, the paper width started at 60mm (as noted in the<br />

specification) and gravitated to 66mm (dollar bill size). While the electric clltter cutter width at the<br />

I 60mm level is not an issue, it becomes an issue at the 66ram 66mm level :ion. c<br />

(see op options 2 & 3). We<br />

were able to source a smaller variant of the 80mm printer mechanism, nee needed led for printing<br />

66mm media, but the availability of smaller cutters is a problem. A manual cutJ cut/tear<br />

I<br />

approach<br />

approach<br />

licensing<br />

is possible though<br />

is possible though<br />

fee in the reduction<br />

we will need to research<br />

we will need to research<br />

shown.<br />

existing<br />

existing<br />

patents<br />

patents<br />

and have assumed<br />

and lav(<br />

a<br />

The final points of clarification are in the areas of NRE and schedule and their relationships<br />

I The to the thefinal options points shown. of clarification The cost costare reductions in the areas outlined of NRE are, and for schedule purposes and of dis discussion, tt cus_ eir u a<br />

comparison of the effects of design choices on the pricing of a production I._vel level product.<br />

The NREs provided in the quotation are for a single set of design objective objectives _an and are<br />

I<br />

reflected in the specified scheduling<br />

reflected in the specified scheduling<br />

commencement would have varying<br />

time-line. A change of direction<br />

time-line. A change of direction<br />

degrees of cost and scheduling<br />

after project<br />

after I_roj_<br />

impa¢ impact [ de dependent<br />

upon the change of scope, and the amount of worlVtesting already performed.<br />

I Please review the listed options and let me know if there the re are any other question questions - I will be<br />

happy to provide any help or additional clarification as necessary. Thank you.<br />

I 425 E,-C-£)LORADO ST., STE 670, GLENDALE, CA 91205 ......<br />

I<br />

818,244.4700 Fax 818,244.4764<br />

CONFIDENTIAL 00140<br />

Nanoptix' Summary Judgment Exhibit No. 13<br />

.........<br />

-A0279-<br />

Page ID<br />

FL0020983