07.07.2013 Views

BOARD OF COUNTY COMMISSIONERS LEON COUNTY, FLORIDA

BOARD OF COUNTY COMMISSIONERS LEON COUNTY, FLORIDA

BOARD OF COUNTY COMMISSIONERS LEON COUNTY, FLORIDA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title: Acceptance of a Status Report Regarding Lake Maintenance and Enhancements<br />

July 10, 2012<br />

Page2<br />

Report and Discussion<br />

Attachment #1<br />

Page 2 of 8<br />

Background:<br />

On March 7, 2012, staff distributed a memo to the Board regarding boat ramp maintenance that<br />

had been occurring since December 2011 (Attachment #1). Together with regularly scheduled<br />

maintenance, staff has been taking advantage of the lower lake levels in the area to accomplish<br />

tasks only possible during these unique conditions.<br />

At its May 8, 2012 meeting, the Board directed staff to bring back an agenda item to address the<br />

low water levels and dry lakes, and to consider how to enhance the lakes while the water levels<br />

are down, how to strengthen the lakes, and maintenance of lakes.<br />

Analysis:<br />

Since the March 7, 2012 memo, these additional maintenance activities have occurred.<br />

Landing/Location Date of<br />

Activity<br />

Type of Activity<br />

27 Landing<br />

(Lake Jackson)<br />

4/3/2012 Dirt ramp regrading<br />

Coe Landing 5/14/12 Access Road and Parking Paving Project<br />

Fuller Landing 6/11/12 Construction permit granted by DEP, Army Corps of Engineers,<br />

(Lake Jackson) NWFWM District<br />

7/2/1 2 Bid Document to be advertised<br />

Gil Waters Preserve<br />

(Lake Munson)<br />

5/25/12 Comfort Station Update, Nature Trail Installation<br />

Hall Landing 5/14/12 Access Road and Parking Paving Project<br />

(Lake Talquin) 6/2/12 Volunteer Day with Tri-Eagle Sales- 4200 Pounds of trash<br />

removed from Lake Talquin Shores by over 80 Volunteers.<br />

4/2/12 Campground Upgrade Project- resetting and upgrading all<br />

campsites to current standards- Completion Date-7 /31/12<br />

Iamonia Landing 3/24/12 Lake Bottom Cleanup with FWC, FSU, and Volunteer Leon-<br />

(Lake Iamonia) 2,400 pounds of litter removed form the dry lake bed.<br />

5/9/1 2 FWC Muck Removal Project along North Shore to Beadle Road<br />

Meginnis Arm Landing<br />

(Lake Jackson)<br />

5/14/ 12 Access Road and Parking Paving Project<br />

Miller Landing<br />

(Lake Jackson)<br />

4/3/1 2 Dirt ramp regrading<br />

Cypress Landing (Lake 6/21/12 Coordination with FWC to repair boat ramp during pending<br />

Miccosukee) draw down of Lake Miccosukee<br />

6/21 /1 2 Pending drawdown of Lake Miccosukee, FWC with be removing<br />

muck material, treating invasive plants and improving fish habitat<br />

Tower Road Landing 3/24/12 Lakeshore Cleanup with Volunteer Leon- 700 pounds of litter<br />

(Ochlocknee River) removed along the Ochlocknee River<br />

Williams Landing 5/14/12 Access Road and Parking Paving Project<br />

Page 167 of 622 Posted at 5:00 p.m. on April 1, 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!