07.07.2013 Views

BOARD OF COUNTY COMMISSIONERS LEON COUNTY, FLORIDA

BOARD OF COUNTY COMMISSIONERS LEON COUNTY, FLORIDA

BOARD OF COUNTY COMMISSIONERS LEON COUNTY, FLORIDA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Attachment #1<br />

Page 4 of 8<br />

Attachment #1<br />

Page 1 of 2<br />

<strong>BOARD</strong> <strong>OF</strong> <strong>COUNTY</strong> <strong>COMMISSIONERS</strong><br />

MEMORANDUM<br />

DATE: March 7, 2012<br />

TO: Board of County Commissioners<br />

THRU: Vincent S. Long, County Administrator<br />

Tony Park, P. E., Director of Public Works and Community<br />

FROM: Leigh Davis, Interim Director of Parks and Recreation<br />

SUBJECT: Maintenance Activities at Boat Landings<br />

In late September, 2011, Public Works and Parks and Recreation staff, along with Commissioner<br />

Proctor, conducted site visits at several of the Leon County boat landing facilities. Based on<br />

evaluation of those visits and due to the low water conditions, staff accelerated maintenance<br />

activities at all ofthe boat landings.<br />

At the January 24, 2012, Board meeting Commissioner Proctor asked for a report to be provided<br />

regarding improvements that have been or could be made to boat landing facilities. Below is a<br />

table of activities summarizing the work that has been completed over the last four months.<br />

Landing/Location Date of Type of Activity<br />

Activity<br />

27 Landing 12/15/11 Dirt ramp regrading<br />

(Lake Jackson)<br />

Bull Headley 1125/12 Redistribution of rock at base of ramp<br />

(Lake Iamonia) 2/20/12 Ramp repair/extension and ADA sidewalk<br />

Cedar Hill Landing 12/14/11 Granite material added to lake side of ramp (32 cubic yards)<br />

(Carr Lake) 12/14/11 Maintenance at base of ramp<br />

03/01112 Redecking of boat dock<br />

03/19/12 ADA access sidewalk- scheduled for construction<br />

Crowder Landing 12/02/11 Redistribution of rock at base of ramp<br />

(Lake Jackson) 01/18/12 Redistribution of rock at base of ramp<br />

02/13/12 Boat ramp extension installed<br />

Faulk Landing<br />

Fuller Landing 02/01/12 Construction permit submitted to DEP<br />

(Lake Jackson)<br />

Hall Landing 03/15/12 Dock redecking<br />

(Lake Talquin)<br />

Iamonia Landing 12/04/11 Redistribution of rock at base of ramp<br />

(Lake Iamonia) 12/12/11 Redistribution of rock at base of ramp<br />

12/22/11 Repair of ramp cracking/undermining<br />

Page 169 of 622 Posted at 5:00 p.m. on April 1, 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!