Fountaingrove Environmental Impact Report - City of Santa Rosa ...
Fountaingrove Environmental Impact Report - City of Santa Rosa ...
Fountaingrove Environmental Impact Report - City of Santa Rosa ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ES082008001BAO_<strong>Fountaingrove</strong>_publicComments_v3.indd_090408_lho<br />
NELSON<br />
JULY 19 – 1<br />
file:///C|/Documents%20and%20Settings/mgerut/My%20Documents/Fountain%20Grove/Comment_Letters/Nelson19July.htm<br />
Round<br />
Barn Boulevard, are now both signalized and provide some gaps in traffic flow<br />
along<br />
<strong>Fountaingrove</strong> Parkway. For this reason, <strong>City</strong> traffic engineering staff have<br />
indicated<br />
their desire not to signalize this intersection. Should the <strong>City</strong> wish to provide an<br />
improvement measure, consideration could be given to providing a median refuge<br />
area<br />
along <strong>Fountaingrove</strong> Parkway just east <strong>of</strong> the intersection to facilitate left turns<br />
from<br />
TLH Drive (West). Resultant operation <strong>of</strong> left turn movements from TLH Drive<br />
(West)<br />
to <strong>Fountaingrove</strong> Parkway would be an acceptable LOS D during both the AM and<br />
PM<br />
peak hours.”<br />
Resolving an Unacceptable Signal Warrant because there are nearby traffic<br />
lights makes little sense and is totally unacceptable. Again, we are<br />
concerned about the safety <strong>of</strong> our citizens. In addition, Volume I Executive<br />
Summary Table ES-1 3.13-1 states a traffic signal would change the impact<br />
from “Significant” to Less than Significant”.<br />
4) The EIR traffic engineer needs to make his own conclusions rather than rely<br />
on the city traffic engineer’s “opinions” while ignoring his own data. See EIR<br />
Volume II, Appendix P Traffic <strong>Impact</strong> <strong>Report</strong>, VII Recommended<br />
Improvements A.2. and A.3<br />
Dated October 18, 2007<br />
<strong>Fountaingrove</strong> Lodge Draft EIR<br />
Appendix P Traffic <strong>Impact</strong> <strong>Report</strong> Continued<br />
file:///C|/Documents%20and%20Settings/mgerut/My%20Doc...nts/Fountain%20Grove/Comment_Letters/Nelson19July.htm (3 <strong>of</strong> 5)8/1/2008 2:10:09 PM