2.0 LIST OF COMMENTERS AND RESPONSE TO COMMENTS<br />

Project construction-related traffic would have a less than significant impact on the<br />

critical commute traffic periods.<br />

7) As described in Section 3.4 <strong>of</strong> the Draft EIR, impacts to oaks and wildlife would be<br />

less than significant with mitigation; see also Master Response Oak Trees and Oak<br />

Woodland.<br />

8) The <strong>City</strong>’s Fire Department reviewed the Draft EIR before its publication and Fire<br />

Department comments have been incorporated in the impact analysis and mitigation<br />

measures. The Project’s increased demand on emergency services is evaluated in<br />

<strong>Impact</strong> 3.11-2 <strong>of</strong> the Draft EIR; with mitigation, impacts will be less than significant.<br />

As noted in <strong>Impact</strong> 3.13-4 <strong>of</strong> the Draft EIR, the installation <strong>of</strong> a signal at the<br />

intersection <strong>of</strong> Thomas Lake Harris and <strong>Fountaingrove</strong> Parkway will improve<br />

emergency access to and from the site.<br />

9) The Project is consistent with General Plan Policy LUL-E-3, which addresses<br />

clustering <strong>of</strong> continuing care facilities. See Master Response Land Use Compatibility<br />

and Draft EIR Appendix C – Project Compatibility with General Plan Goals and<br />

Policies.<br />

10) Comment noted. The <strong>City</strong> agrees that <strong>Fountaingrove</strong> Parkway (West) and Thomas<br />

Lake Harris Drive intersection is the most direct access to the Project site and is<br />

assumed by the <strong>City</strong> as the primary access point for construction traffic. The <strong>City</strong>’s<br />

detailed limitations on the Contractor regarding construction traffic will occur in the<br />

final design plans and specifications.<br />

2-76 ES092008001PHX\BAO\082970001