A <strong>Review</strong> <strong>of</strong> <strong>Highway</strong> <strong>Agencies</strong> <strong>in</strong> <strong>the</strong> <strong>South</strong> <strong>Asia</strong> <strong>Region</strong><br />

53 RTA (2009). Annual report.<br />

The New <strong>South</strong> Wales Roadside Environmental Committee was formed <strong>in</strong> 1994 to<br />

encourage better management <strong>of</strong> <strong>the</strong> roadside environment. It currently comprises<br />

11 organizations, <strong>in</strong>clud<strong>in</strong>g RTA.<br />

Private Sector Participation and Procurement<br />

Procurement<br />

RTA uses tender procedures to contract private parties for works and services. The<br />

procedure’s current opportunities are published on <strong>the</strong> RTA website. Activities that are<br />

outsourced <strong>in</strong>clude, amongst o<strong>the</strong>rs:<br />

Ma<strong>in</strong>tenance works (rout<strong>in</strong>e and periodic);<br />

Design and construction;<br />

Site supervision;<br />

Traffic Management Center activities; and<br />

Supply, implementation and ma<strong>in</strong>tenance <strong>of</strong> data center process<strong>in</strong>g and communication<br />

services, survey<strong>in</strong>g (travel time).<br />

Public Private Partnerships<br />

PPP activity <strong>in</strong> Australia has occurred primarily as a state affair. Like o<strong>the</strong>r states (Victoria<br />

and Queensland), NSW has used highway PPP arrangements almost exclusively to facilitate<br />

<strong>the</strong> development <strong>of</strong> major segments <strong>of</strong> highway <strong>in</strong>frastructure <strong>in</strong> its major urban center,<br />

Sydney.<br />

In NSW, RTA has oversight <strong>of</strong> its highway system as well as its PPP program. It entered<br />

<strong>in</strong>to its first arrangement via an unsolicited proposal for <strong>the</strong> Sydney Harbor Tunnel, which<br />

opened for service <strong>in</strong> August 1992. Subsequently, <strong>the</strong> state has used seven additional PPP<br />

contracts to complete <strong>the</strong> orbital (perimeter or r<strong>in</strong>g road) around Sydney, <strong>the</strong> most recent<br />

be<strong>in</strong>g three projects delivered <strong>in</strong> a five-year period: <strong>the</strong> Cross City Tunnel, <strong>the</strong> M7 Motorway,<br />

and <strong>the</strong> Lane Cove Tunnel.<br />

While governments may propose ei<strong>the</strong>r a lump sum or an annual contribution to <strong>the</strong><br />

contractor <strong>in</strong> <strong>the</strong>ir request for proposals, respondents (bidders) have typically proposed <strong>the</strong><br />

elim<strong>in</strong>ation or reduction <strong>of</strong> <strong>the</strong>se contributions by government <strong>in</strong> <strong>the</strong>ir proposals. In NSW,<br />

<strong>the</strong> government now typically specifies <strong>the</strong> <strong>in</strong>itial toll rate and uses <strong>in</strong>dex<strong>in</strong>g techniques for<br />

escalation.<br />

The agreements with <strong>the</strong> concession holders have been signed to f<strong>in</strong>ance, design, construct,<br />

operate and ma<strong>in</strong>ta<strong>in</strong> <strong>the</strong> <strong>in</strong>frastructure. Under <strong>the</strong> terms <strong>of</strong> <strong>the</strong> Project Deeds, ‘ownership’<br />

<strong>of</strong> <strong>the</strong> <strong>in</strong>frastructure will revert to <strong>the</strong> RTA ei<strong>the</strong>r after a fixed period or, <strong>in</strong> some cases, on<br />

<strong>the</strong> earlier achievement <strong>of</strong> specified f<strong>in</strong>ancial returns outl<strong>in</strong>ed <strong>in</strong> <strong>the</strong> Deed or a fixed period<br />

from <strong>the</strong> commencement date. The periods vary per contract between 25 and 48 years.<br />

Audit and Control<br />

F<strong>in</strong>ancial Audits<br />

An <strong>in</strong>dependent assessment <strong>of</strong> risks and compliance with policies, procedures and Treasury<br />

guidel<strong>in</strong>es is conducted yearly. An ongo<strong>in</strong>g review and update <strong>of</strong> f<strong>in</strong>ancial policies and<br />

procedures is conducted to ensure that RTA has a robust f<strong>in</strong>ancial management framework<br />

to mitigate risk and, eventually, to support RTA’s statutory and bus<strong>in</strong>ess requirements. In<br />

2008-09, one <strong>of</strong> <strong>the</strong> <strong>in</strong>itiatives was to develop a dedicated management system to track <strong>the</strong><br />

f<strong>in</strong>ancial aspects <strong>of</strong> PPPs over <strong>the</strong> full span <strong>of</strong> each contract.<br />

The Auditor-General yearly performs an <strong>in</strong>dependent audit and provides<br />

recommendations for improvement. The 2006 audit recognized that “<strong>the</strong> RTA has done<br />

well to recognize <strong>the</strong> importance <strong>of</strong> measur<strong>in</strong>g structural condition and progressively<br />

improve its methods to do so” 53 .<br />

156

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!