A <strong>Review</strong> <strong>of</strong> <strong>Highway</strong> <strong>Agencies</strong> <strong>in</strong> <strong>the</strong> <strong>South</strong> <strong>Asia</strong> <strong>Region</strong><br />

b. Average cost <strong>of</strong> construction (to be extracted from <strong>the</strong> <strong>in</strong>formation filled for <strong>in</strong>dicator 11)<br />

except for o<strong>the</strong>r roads. For o<strong>the</strong>r roads, average unit costs as applicable to village roads<br />

may be adopted.<br />

• Cost per km, say, as on January 1, 2011<br />

o Cost for new construction (2 lane) = `20 million per km<br />

o Cost for new construction (4 lane) = `70 million per km<br />

o Cost for new construction (less than 2 lane) = Assume it to be 50<br />

percent <strong>of</strong> 2 lane new<br />

construction<br />

`10 million per km<br />

o Cost for new construction <strong>of</strong> rural roads = `2 million per km<br />

• These cost figures may be assumed as replacement value <strong>of</strong> <strong>the</strong> network <strong>in</strong> good<br />

condition. For roads <strong>in</strong> fair condition, <strong>the</strong> cost figures may be reduced by 20 percent <strong>of</strong><br />

<strong>the</strong> values given above. For roads <strong>in</strong> poor condition, <strong>the</strong> cost figures may be reduced by<br />

40 per cent.<br />

c. Replacement value computations<br />

National <strong>Highway</strong>s<br />

• Less than 2 lane: 800 km<br />

20 percent, i.e., 160 km <strong>in</strong> poor condition,<br />

replacement value @ `6 million per km = `960 million<br />

30 percent, i.e., 240 km <strong>in</strong> fair condition,<br />

replacement value @ `8 million per km = `1,920 million<br />

50 percent, i.e., 400 km <strong>in</strong> good condition,<br />

its replacement value @ `10 million per km = `4,000 million<br />

• 2 lane: 1,800 km @ `20 million per km = `36,000 million<br />

• 4 lane or more:<br />

400 km @ `70 million per km = `28,000 million<br />

Subtotal for NHs = `70,880 million<br />

State <strong>Highway</strong>s<br />

• Less than 2 lane: 3,300 km<br />

40 percent, i.e., 1,320 km <strong>in</strong> poor condition,<br />

replacement value @ `6 million per km = `7,920 million<br />

40 percent, i.e., 1,320 km <strong>in</strong> fair condition,<br />

replacement value @ `8 million per km = `10,560 million<br />

20 percent, i.e., 660 km <strong>in</strong> good condition,<br />

its replacement value @ `10 million per km = `6,600 million<br />

• 2 lane: 1,600 km @ `20 million per km = `32,000 million<br />

• 4 lane or more: 100 km @ `70 million per km = `7,000 million<br />

Subtotal for SHs = `64,080 million<br />

Major District Roads<br />

• Less than 2 lane: 7,400 km<br />

60 percent, i.e., 4,440 km <strong>in</strong> poor condition,<br />

replacement value @ `6 million per km = `26,640 million<br />

20 percent, i.e., 1,480 km <strong>in</strong> fair condition,<br />

replacement value @ `8 million per km = `11,840 million<br />

20 percent, i.e., 1,480 km <strong>in</strong> good condition,<br />

its replacement value @ `10 million per km = `14,800 million<br />

• 2 lane: 600 km @ `20 million per km = `12,000 million<br />

Subtotal for MDRs = `65,280 million<br />