06.08.2013 Views

A Review of Highway Agencies in the South Asia Region

A Review of Highway Agencies in the South Asia Region

A Review of Highway Agencies in the South Asia Region

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. 6 Whe<strong>the</strong>r road condition surveys are be<strong>in</strong>g done<br />

regularly?<br />

A <strong>Review</strong> <strong>of</strong> <strong>Highway</strong> <strong>Agencies</strong> <strong>in</strong> <strong>the</strong> <strong>South</strong> <strong>Asia</strong> <strong>Region</strong><br />

1. 7 Safety Historical<br />

Accident<br />

Statistics/<br />

Scenario<br />

<strong>Highway</strong> Agency (States)<br />

Yes/No (Obta<strong>in</strong> copy <strong>of</strong> <strong>the</strong> latest<br />

survey, if Yes)<br />

No. <strong>of</strong> accidents<br />

No. <strong>of</strong> deaths<br />

No. <strong>of</strong> <strong>in</strong>juries<br />

• Per 1,000<br />

vehicles<br />

• Per 100,000<br />

population<br />

Measurable/Identifiable<br />

Loss due Parameters/Indicators<br />

to accidents per annum<br />

1. - Provides Accessibility Road Infrastructure<br />

that provides transport services – movement <strong>of</strong> goods and men<br />

1. 8 Total Length <strong>of</strong> Network, Category -wise<br />

1.1 Road policy, <strong>in</strong>vestment plan / road master Yes/No. If yes, please attach a copy <strong>of</strong><br />

plan, vision document, annual reports – <strong>in</strong> place document and provide a summary <strong>of</strong><br />

- Traffic Growth<br />

salient features, goals and targets.<br />

1.<br />

1.2<br />

9 Please<br />

Are <strong>the</strong>y<br />

obta<strong>in</strong><br />

published<br />

an abstract<br />

regularly?<br />

<strong>of</strong> <strong>the</strong> latest traffic volume on<br />

Yes/No<br />

SHs and MDRs or any o<strong>the</strong>r traffic<br />

data, e.g. , total registered vehicle <strong>in</strong> <strong>the</strong> state or total vehicles on <strong>the</strong> road, etc., available<br />

1.3 What is <strong>the</strong> basis/strategy <strong>of</strong> convert<strong>in</strong>g roads<br />

1.10<br />

from<br />

Number<br />

one category<br />

<strong>of</strong> total<br />

to<br />

permanent<br />

ano<strong>the</strong>r category?<br />

traffic count<br />

Please<br />

stations on <strong>the</strong> network.<br />

provide data on roads converted <strong>in</strong> <strong>the</strong> last two<br />

1.11<br />

years.<br />

Number <strong>of</strong> automated traffic count stations on <strong>the</strong> network (if any)<br />

1.12<br />

1.4<br />

When<br />

What is<br />

(year)<br />

<strong>the</strong> strategy<br />

<strong>the</strong>ir location<br />

<strong>of</strong> entrust<strong>in</strong>g<br />

was reassessed?<br />

roads to<br />

Road Corporations/Boards? Please provide data on<br />

1.13<br />

roads<br />

What<br />

entrusted<br />

is <strong>the</strong><br />

<strong>in</strong><br />

strategy<br />

last two<br />

and<br />

years.<br />

frequency <strong>of</strong> traffic data collection?<br />

2.<br />

- Congestion free, mobility (Plan Roads)<br />

Investments <strong>in</strong> Provision <strong>of</strong> Road Infrastructure<br />

2.1 1.5 Total Please Length obta<strong>in</strong> <strong>of</strong> a copy <strong>of</strong> <strong>the</strong> Budget (2008-09)<br />

Annual Amount (2008-09)<br />

2.2<br />

Category<br />

Government<br />

<strong>of</strong> Roads<br />

budget (<strong>in</strong>clud<strong>in</strong>g<br />

Length <strong>in</strong><br />

external<br />

assistance)<br />

km (as <strong>of</strong> March 31, 2009)<br />

4 lane roads<br />

2 lane a) roads New construction (<strong>in</strong>clud<strong>in</strong>g external<br />

Intermediate assistance) lane<br />

roads<br />

b) Upgradation, rehabilitation<br />

S<strong>in</strong>gle lane roads<br />

Any c) O<strong>the</strong>r Ma<strong>in</strong>tenance<br />

i. Rout<strong>in</strong>e ma<strong>in</strong>tenance<br />

- Comfortable ride<br />

ii. Periodic ma<strong>in</strong>tenance (renewal <strong>of</strong><br />

Under Construction<br />

Total Budget<br />

(km)<br />

Allocated<br />

(INR million)<br />

Total (km)<br />

Expenditure<br />

(INR million)<br />

surface)<br />

1. 6 Whe<strong>the</strong>r road condition surveys are be<strong>in</strong>g done<br />

iii. Emergency ma<strong>in</strong>tenance<br />

regularly?<br />

Yes/No (Obta<strong>in</strong> copy <strong>of</strong> <strong>the</strong> latest<br />

survey, if Yes)<br />

d) Budget on project preparation<br />

1. 7 Safety e) Budget on tra<strong>in</strong><strong>in</strong>g<br />

Historical No. <strong>of</strong> accidents • Per 1,000<br />

f) Budget on R&D<br />

Accident<br />

Statistics/<br />

No. <strong>of</strong> deaths<br />

No. <strong>of</strong> <strong>in</strong>juries<br />

vehicles<br />

• Per 100,000<br />

2.3 Private sector f<strong>in</strong>anc<strong>in</strong>g<br />

Scenario<br />

population<br />

a)<br />

b)<br />

BOT (Toll)<br />

BOT (Annuity)<br />

Loss due to accidents per annum<br />

- Accessibility c) MOT (O&M Contracts)<br />

d) Project Specific SPV<br />

1. 8 Total Length <strong>of</strong> Network, Category -wise<br />

(Please <strong>in</strong>clude a brief note on PPP <strong>in</strong>itiatives <strong>in</strong> <strong>the</strong><br />

last 5 years by <strong>the</strong> state)<br />

- Traffic Growth<br />

2.4 Force Account<br />

1. 9 Please obta<strong>in</strong> an abstract <strong>of</strong> <strong>the</strong> latest traffic volume on SHs and MDRs or any o<strong>the</strong>r traffic<br />

2.5 Adm<strong>in</strong>istrative Cost<br />

data, e.g. , total registered vehicle <strong>in</strong> <strong>the</strong> state or total vehicles on <strong>the</strong> road, etc., available<br />

2.6 State Road Funds<br />

1.10 Number a) For <strong>of</strong> total development permanent traffic count stations on <strong>the</strong> …………….<br />

network.<br />

…………….<br />

b) For ma<strong>in</strong>tenance<br />

…………….<br />

…………….<br />

1.11 Number <strong>of</strong> automated traffic count stations on <strong>the</strong> network (if any)<br />

2.7 Any o<strong>the</strong>r sources <strong>of</strong> funds (NABARD, TFC,<br />

CRF,<br />

1.12 When<br />

etc.)<br />

(year) <strong>the</strong>ir location was reassessed?<br />

93<br />

2.8 Gap <strong>in</strong> Availability <strong>of</strong> Funds (2008-09)<br />

1.13 What is <strong>the</strong> strategy and Funds frequency Required <strong>of</strong> traffic data Funds collection?<br />

Available<br />

For development<br />

Gap

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!