06.08.2013 Views

A Review of Highway Agencies in the South Asia Region

A Review of Highway Agencies in the South Asia Region

A Review of Highway Agencies in the South Asia Region

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.1 3 Preparedness for delivery/implementation<br />

a) Number and amount <strong>of</strong> projects<br />

• Projects carried over at <strong>the</strong> beg<strong>in</strong>n<strong>in</strong>g <strong>of</strong><br />

A <strong>Review</strong> <strong>of</strong> <strong>Highway</strong> 2008 <strong>Agencies</strong> -09 <strong>in</strong> <strong>the</strong> <strong>South</strong> <strong>Asia</strong> <strong>Region</strong><br />

• Project sanctioned <strong>in</strong> <strong>the</strong> year 2008-09<br />

b) Ratio <strong>of</strong> Bank <strong>of</strong> sanctions with respect to<br />

annual outlay<br />

<strong>Highway</strong> Agency (States)<br />

9.3 1.11 Whe<strong>the</strong>r Number <strong>the</strong> <strong>of</strong> automated road agency traffic publishes count any stations Annual on <strong>the</strong> network (yes/no) (if any)<br />

Report s/MIS Reports ?<br />

1.1 1 When (year) <strong>the</strong>ir location was reassessed?<br />

97<br />

9.4 Describe major reforms undertaken <strong>in</strong> <strong>the</strong><br />

1.1 2 last What 5 years is <strong>the</strong> strategy and frequency <strong>of</strong> traffic data collection?<br />

Number Amount INR million<br />

1. Provides 3.1 4 Pr<strong>of</strong>essional Road Infrastructure<br />

affiliations and education levels<br />

Number<br />

that a) provides Membership transport <strong>of</strong> Indian services Roads – Congress movement <strong>of</strong> goods and men<br />

Percent to Total<br />

• CE/Head <strong>of</strong> Department<br />

1.1 • SE Road policy, <strong>in</strong>vestment plan / road master Yes/No. If yes, please attach a copy <strong>of</strong><br />

plan, • EE vision document, annual reports – <strong>in</strong> place document and provide a summary <strong>of</strong><br />

• AE<br />

salient feat ures, goals and targets.<br />

b) Membership <strong>of</strong> IRC Committees<br />

1.2 • CE/Head Are <strong>the</strong>y published <strong>of</strong> Department regularly?<br />

• SE<br />

1.3<br />

• EE<br />

What is <strong>the</strong> basis/strategy <strong>of</strong> convert<strong>in</strong>g roads<br />

from<br />

• AE<br />

one category to ano<strong>the</strong>r category? Please<br />

provide<br />

c) Membership<br />

data on roads<br />

<strong>of</strong> IRC<br />

converted<br />

Council<br />

<strong>in</strong> <strong>the</strong> last two<br />

years.<br />

d) No. <strong>of</strong> PhDs<br />

e) No. <strong>of</strong> Post -graduates<br />

1.4<br />

f) No.<br />

What<br />

<strong>of</strong><br />

is<br />

MBAs<br />

<strong>the</strong> strategy <strong>of</strong> entrust<strong>in</strong>g ro ads to<br />

Road<br />

g) No.<br />

Corporations/Boards<br />

<strong>of</strong> Law Graduates<br />

? Please provide data on<br />

roads<br />

h) Any<br />

entrusted<br />

o<strong>the</strong>r skills<br />

<strong>in</strong> last two years.<br />

Yes/No<br />

6.<br />

- Congestion free, mobility (Plan Roads)<br />

NGOs, Road Transport Associations<br />

a)<br />

1.5 Total<br />

Provide<br />

Length<br />

list <strong>of</strong><br />

<strong>of</strong><br />

NGO’s concerned with road<br />

sector and <strong>in</strong>teract<strong>in</strong>g with <strong>the</strong> department<br />

b)<br />

Category<br />

Provide<br />

<strong>of</strong><br />

list<br />

Roads<br />

<strong>of</strong> bus/truck<strong>in</strong>g<br />

Length<br />

services<br />

<strong>in</strong><br />

association<br />

Under Construction<br />

<strong>in</strong>teract<strong>in</strong>g with <strong>the</strong> department<br />

km (as <strong>of</strong> March 31, 2009) (km)<br />

c) Road user satisfaction surveys carried out? If<br />

4 lane roads<br />

so, obta<strong>in</strong> a copy <strong>of</strong> <strong>the</strong> latest report.<br />

2 lane roads<br />

Total (km)<br />

7. Legal Intermediate Framework lane<br />

• roads Give a list <strong>of</strong> various acts <strong>in</strong>clud<strong>in</strong>g State<br />

S<strong>in</strong>gle <strong>Highway</strong> lane roads Act, Road Ma<strong>in</strong>tenance Policy,<br />

Any Transparency O<strong>the</strong>r <strong>in</strong> Public Procurement, etc., at<br />

<strong>the</strong> state level applicable to roads and road<br />

- Comfortable<br />

transport.<br />

ride<br />

Obta<strong>in</strong> a copy <strong>of</strong> all acts.<br />

8. Road 1. 6 Whe<strong>the</strong>r F<strong>in</strong>anc<strong>in</strong>g road condition surveys are be<strong>in</strong>g done<br />

regularly?<br />

8.1 Whe<strong>the</strong>r <strong>the</strong>re is a legal framework for PPP?<br />

8.2 Whe<strong>the</strong>r <strong>the</strong> state has a Toll Policy?<br />

8.3<br />

1. 7<br />

Whe<strong>the</strong>r<br />

Safety<br />

<strong>the</strong> state has raised f<strong>in</strong>ances<br />

Historical<br />

for road<br />

development through market borrow<strong>in</strong>gs?<br />

Accident<br />

8.4 Any o<strong>the</strong>r <strong>in</strong>novative f<strong>in</strong>anc<strong>in</strong>g methods<br />

Statistics/<br />

used by<br />

<strong>the</strong> state for road development or ma<strong>in</strong>tenance?<br />

Scenario<br />

Measurable/Identifiable<br />

Parameters/Indicators<br />

Yes/No (Obta<strong>in</strong> copy <strong>of</strong> <strong>the</strong> latest<br />

survey, if Yes)<br />

No. <strong>of</strong> accidents<br />

No. <strong>of</strong> d eaths<br />

No. <strong>of</strong> <strong>in</strong>juries<br />

• Per 1,000<br />

vehicles<br />

• Per 100,000<br />

population<br />

Loss due to accidents per annum<br />

- Accessibility<br />

9. Reforms Undertaken<br />

1. 8 Total Length <strong>of</strong> Network, Category -wise<br />

9.1 Whe<strong>the</strong>r any <strong>in</strong>stitutional streng<strong>the</strong>n<strong>in</strong>g study (yes/no)<br />

was carried out and an action plan was developed<br />

towards - Traffic Growth modernization <strong>of</strong> <strong>the</strong> agency?<br />

Obta<strong>in</strong> a copy <strong>of</strong> <strong>the</strong> study<br />

1. 9 Please obta<strong>in</strong> an abstract <strong>of</strong> <strong>the</strong> latest traffic volume on SHs and MDRs or any o<strong>the</strong>r traffic<br />

9.2 data, Whe<strong>the</strong>r e.g. , total <strong>the</strong> registered road agency vehicle has a <strong>in</strong> five <strong>the</strong> year state or total vehicles (yes/no) on <strong>the</strong> road , etc., available<br />

<strong>in</strong>vestment plan/bus<strong>in</strong>ess plan?<br />

1.1 0 Number <strong>of</strong> total permanent traffic count stations on <strong>the</strong> network .

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!