7k Expenditure on R&D, technology and <strong>in</strong>novation Million ` 0.5 0.5 0.5<br />

8 Delivery <strong>of</strong> Road Infrastructure<br />

8a Projects completed (amount)<br />

Million ` 1.0 2.0 1.0<br />

8b Projects <strong>in</strong> progress (amount) Million ` 1.0 2.0 1.0<br />

A <strong>Review</strong> <strong>of</strong> <strong>Highway</strong> <strong>Agencies</strong> <strong>in</strong> <strong>the</strong> <strong>South</strong> <strong>Asia</strong> <strong>Region</strong><br />

8c Projects ready for bidd<strong>in</strong>g (amount) Million ` 2.0 2.0 2.0<br />

Sub Total for Capacity 15.0 20.0 15.0<br />

9 CPI <strong>of</strong> Major Projects Absolute<br />

3.0 4.0 3.0<br />

number<br />

10 SPI <strong>of</strong> Major Projects Absolute<br />

3.0 4.0 3.0<br />

number<br />

11 Average Cost <strong>of</strong> Construction<br />

11a Widen<strong>in</strong>g to 2-lane without paved shoulders Million `/km 0.5 0.5 0.5<br />

Efficiency To Provide<br />

Value for<br />

Money <strong>in</strong><br />

Delivery <strong>of</strong><br />

Infrastructure<br />

11b Widen<strong>in</strong>g to 2-lane with paved shoulders Million `/km 0.5 0.5 0.5<br />

11c Widen<strong>in</strong>g 2-lane to 4-lane Million `/km 0.5 0.5 0.5<br />

11d Widen<strong>in</strong>g 4-lane to 6-lane Million `/km 0.5 0.5 0.5<br />

11e New construction: 2 lane Million `/km 0.5 0.5 0.5<br />

11f New construction: 4 lane Million `/km 0.5 0.5 0.5<br />

11g New construction: 6 lane Million `/km 0.5 0.5 0.5<br />

11h Periodic ma<strong>in</strong>tenance (streng<strong>the</strong>n<strong>in</strong>g + overlay) (2 lane) Million `/km 0.5 0.5 0.5<br />

89<br />

11i Rout<strong>in</strong>e ma<strong>in</strong>tenance (2 lane) Million `/km 0.5 0.5 0.5<br />

12 Staff and Adm<strong>in</strong>istrative Cost Million ` 0.5 0.5 0.5<br />

13 Asset Value (Replacement Cost) <strong>of</strong> CRN Billion ` 3.0 4.0 3.0<br />

14 Road Safety Audit Conducted Km or number 1.0 2.0 1.0<br />

<strong>of</strong> projects<br />

15 Social and Environmental Impact Assessment Carried Out Projects - 1.0 2.0 1.0<br />

Number<br />

16 Entity wide ISO or equivalent certification received (Yes / No) 1.0 1.0 1.0<br />

17 Standard Bid Documents Developed (Yes / No) 1.0 1.0 1.0<br />

18 Computerization / Enterprise Resource Plann<strong>in</strong>g <strong>in</strong> Place (Yes / No) 1.0 1.0 1.0<br />

19 Amount <strong>of</strong> Claims under Dispute Million ` 1.0 1.0 1.0<br />

Sub Total for Efficiency 20.0 25.0 20.0<br />

20 Network Congestion Indices<br />

20a Congestion free CRN % 5.0 6.0 5.0<br />

20b Congested CRN % 1.0 1.0 1.0<br />

To Provide a<br />

Safer, Greener,<br />

Reliable and<br />

Comfortable<br />

Road Network<br />

Quality <strong>of</strong><br />

Road Network<br />

20c Over-congested CRN % 0.0 0.0 0.0<br />

21 Network Quality Index Absolute<br />

6.0 7.0 6.0<br />

number<br />

22a Fatalities per 100 km <strong>of</strong> network Number 2.0 2.0 2.0