06.08.2013 Views

A Review of Highway Agencies in the South Asia Region

A Review of Highway Agencies in the South Asia Region

A Review of Highway Agencies in the South Asia Region

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

land management<br />

f) Environment impact assessment<br />

A <strong>Review</strong> <strong>of</strong> <strong>Highway</strong> g) Traffic <strong>Agencies</strong> assessment, <strong>in</strong> <strong>the</strong> <strong>South</strong> safety <strong>Asia</strong> <strong>Region</strong> reco rd<br />

h) Contract adm<strong>in</strong>istration, dispute resolution<br />

i) Ma<strong>in</strong>tenance plann<strong>in</strong>g and programm<strong>in</strong>g<br />

j) IT related functions<br />

k)<br />

l)<br />

Asset management cell<br />

<strong>Highway</strong> Agency (States)<br />

F<strong>in</strong>ancial management <strong>in</strong>formation system<br />

1. 6 Whe<strong>the</strong>r road condition surveys are be<strong>in</strong>g done<br />

regularly?<br />

3. 9 Total number <strong>of</strong> personnel exclud<strong>in</strong>g gang labor<br />

− Technical<br />

1. 7 Safety Historical<br />

− Non-technical<br />

Accident<br />

o Accountants<br />

Statistics/<br />

o Adm<strong>in</strong>istration<br />

Scenario<br />

o O<strong>the</strong>rs<br />

Measurable/Identifiable<br />

Parameters/Indicators<br />

m) Procurement <strong>of</strong> PPP projects<br />

n) Project monitor<strong>in</strong>g and debottleneck<strong>in</strong>g<br />

o) Library<br />

p) Public relations <strong>of</strong>ficer<br />

q) Legal cell<br />

r) <strong>Highway</strong> patroll<strong>in</strong>g<br />

s) Mechanical<br />

t) Electrical<br />

u) O<strong>the</strong>rs<br />

3.7 Sectors o<strong>the</strong>r than roads<br />

− Build<strong>in</strong>gs<br />

Yes No<br />

− Any o<strong>the</strong>r (please specify)<br />

Yes No<br />

3.8 (Provide <strong>in</strong>formation only for roads) *<br />

1. Provides Road Infrastructure<br />

that provides transport services – movement <strong>of</strong> goods and men<br />

1.1 Road policy, <strong>in</strong>vestment plan / road master Yes/No. If yes, please attach a copy <strong>of</strong><br />

plan, vision document, annual reports – <strong>in</strong> place document and provide a summary <strong>of</strong><br />

salient features, goals and targets.<br />

1.2 Are <strong>the</strong>y published regularly?<br />

Yes/No<br />

1.3 What is <strong>the</strong> basis/strategy <strong>of</strong> convert<strong>in</strong>g roads<br />

from one category to ano<strong>the</strong>r category? Please<br />

provide data on roads converted <strong>in</strong> <strong>the</strong> last two<br />

years.<br />

1.4 What is <strong>the</strong> strategy <strong>of</strong> entrust<strong>in</strong>g roads to<br />

Road Corporations/Boards? Please provide data on<br />

Workload per Unit<br />

roads entrusted <strong>in</strong> last two years.<br />

Number<br />

(INR million )<br />

Avg.<br />

- Congestion free, mobility (Plan Roads)<br />

O<br />

Length<br />

Field th<br />

(km) Highest Avg.<br />

e<br />

1.5 Total Length <strong>of</strong><br />

rs<br />

a) Number <strong>of</strong> Chief Eng<strong>in</strong>eers<br />

Category b) Number <strong>of</strong> Roads <strong>of</strong> Super<strong>in</strong>tend<strong>in</strong>g Length <strong>in</strong> Eng<strong>in</strong>eers Under Construction Total (km)<br />

c) Number <strong>of</strong> Divisional km (as Eng<strong>in</strong>eers <strong>of</strong> March for 31, Execution<br />

2009) (km)<br />

4 lane roads - Prov<strong>in</strong>cial Divisions<br />

2 lane roads - Field level PIUs<br />

Intermediate d) Number lane <strong>of</strong> Sub-Divisional/Assistant Eng<strong>in</strong>eers<br />

roads<br />

e) Number <strong>of</strong> Junior Eng<strong>in</strong>eers<br />

S<strong>in</strong>gle lane roads<br />

f) Number <strong>of</strong> Divisions for ma<strong>in</strong>tenance, if<br />

Any O<strong>the</strong>r exclusively exist<strong>in</strong>g for this purpose<br />

- Comfortable ride<br />

Yes/No (Obta<strong>in</strong> copy <strong>of</strong> <strong>the</strong> latest<br />

survey, if Yes)<br />

HQ Field Total<br />

No. <strong>of</strong> accidents • Per 1,000<br />

No. <strong>of</strong> deaths<br />

vehicles<br />

No. <strong>of</strong> <strong>in</strong>juries • Per 100,000<br />

population<br />

Loss due to accidents per annum<br />

3. - Accessibility<br />

10 Personnel (cadre situation)<br />

a) Obta<strong>in</strong> a copy <strong>of</strong> <strong>the</strong> latest pay scales and<br />

1. 8 Total obta<strong>in</strong> Length a copy <strong>of</strong> <strong>of</strong> Network, ‘Cadre and Category Recruitment -wise Rules<br />

<strong>of</strong> <strong>the</strong> PWD’ (or equivalent) if exist<strong>in</strong>g.<br />

-<br />

b)<br />

Traffic<br />

Describe<br />

Growth<br />

government policy on recruitment at<br />

Junior , Assistant and Executive Eng<strong>in</strong>eer levels<br />

1. 9 Please<br />

and its<br />

obta<strong>in</strong><br />

implementation.<br />

an abstract <strong>of</strong> <strong>the</strong> latest traffic volume on SHs and MDRs or any o<strong>the</strong>r traffic<br />

data,<br />

c) Does<br />

e.g.<br />

<strong>the</strong><br />

, total<br />

state<br />

registered<br />

have an<br />

vehicle<br />

outsourc<strong>in</strong>g<br />

<strong>in</strong> <strong>the</strong><br />

policy<br />

state<br />

for<br />

or total vehicles on <strong>the</strong> road, etc., available<br />

recruit<strong>in</strong>g contract workers / specialists<br />

* If functions M<strong>in</strong>imum Age (years) Tenure<br />

d) When<br />

<strong>of</strong> roads<br />

was<br />

and<br />

<strong>the</strong><br />

o<strong>the</strong>r<br />

last recruitment<br />

sector are comb<strong>in</strong>ed,<br />

done at JE/AE<br />

please specify.<br />

1.10 Number <strong>of</strong> total permanent traffic count stations on <strong>the</strong> qualify<strong>in</strong>g network.<br />

level? Give details.<br />

service<br />

1.11<br />

e) Describe<br />

Number <strong>of</strong><br />

steps<br />

automated<br />

taken by<br />

traffic<br />

government<br />

count stations<br />

for career<br />

on <strong>the</strong> network<br />

for next<br />

(if any)<br />

(Average<br />

Max. Ave.<br />

progression<br />

level<br />

years)<br />

f) Average age and tenure <strong>of</strong> <strong>of</strong>ficers (refer to table) (years)<br />

1.12 When (year) <strong>the</strong>ir location was reassessed?<br />

95<br />

− Technical head <strong>of</strong> organization<br />

1.13 What is <strong>the</strong> strategy and frequency <strong>of</strong> traffic data collection?<br />

− Chief Eng<strong>in</strong>eer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!