A Review of Highway Agencies in the South Asia Region
A Review of Highway Agencies in the South Asia Region
A Review of Highway Agencies in the South Asia Region
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
land management<br />
f) Environment impact assessment<br />
A <strong>Review</strong> <strong>of</strong> <strong>Highway</strong> g) Traffic <strong>Agencies</strong> assessment, <strong>in</strong> <strong>the</strong> <strong>South</strong> safety <strong>Asia</strong> <strong>Region</strong> reco rd<br />
h) Contract adm<strong>in</strong>istration, dispute resolution<br />
i) Ma<strong>in</strong>tenance plann<strong>in</strong>g and programm<strong>in</strong>g<br />
j) IT related functions<br />
k)<br />
l)<br />
Asset management cell<br />
<strong>Highway</strong> Agency (States)<br />
F<strong>in</strong>ancial management <strong>in</strong>formation system<br />
1. 6 Whe<strong>the</strong>r road condition surveys are be<strong>in</strong>g done<br />
regularly?<br />
3. 9 Total number <strong>of</strong> personnel exclud<strong>in</strong>g gang labor<br />
− Technical<br />
1. 7 Safety Historical<br />
− Non-technical<br />
Accident<br />
o Accountants<br />
Statistics/<br />
o Adm<strong>in</strong>istration<br />
Scenario<br />
o O<strong>the</strong>rs<br />
Measurable/Identifiable<br />
Parameters/Indicators<br />
m) Procurement <strong>of</strong> PPP projects<br />
n) Project monitor<strong>in</strong>g and debottleneck<strong>in</strong>g<br />
o) Library<br />
p) Public relations <strong>of</strong>ficer<br />
q) Legal cell<br />
r) <strong>Highway</strong> patroll<strong>in</strong>g<br />
s) Mechanical<br />
t) Electrical<br />
u) O<strong>the</strong>rs<br />
3.7 Sectors o<strong>the</strong>r than roads<br />
− Build<strong>in</strong>gs<br />
Yes No<br />
− Any o<strong>the</strong>r (please specify)<br />
Yes No<br />
3.8 (Provide <strong>in</strong>formation only for roads) *<br />
1. Provides Road Infrastructure<br />
that provides transport services – movement <strong>of</strong> goods and men<br />
1.1 Road policy, <strong>in</strong>vestment plan / road master Yes/No. If yes, please attach a copy <strong>of</strong><br />
plan, vision document, annual reports – <strong>in</strong> place document and provide a summary <strong>of</strong><br />
salient features, goals and targets.<br />
1.2 Are <strong>the</strong>y published regularly?<br />
Yes/No<br />
1.3 What is <strong>the</strong> basis/strategy <strong>of</strong> convert<strong>in</strong>g roads<br />
from one category to ano<strong>the</strong>r category? Please<br />
provide data on roads converted <strong>in</strong> <strong>the</strong> last two<br />
years.<br />
1.4 What is <strong>the</strong> strategy <strong>of</strong> entrust<strong>in</strong>g roads to<br />
Road Corporations/Boards? Please provide data on<br />
Workload per Unit<br />
roads entrusted <strong>in</strong> last two years.<br />
Number<br />
(INR million )<br />
Avg.<br />
- Congestion free, mobility (Plan Roads)<br />
O<br />
Length<br />
Field th<br />
(km) Highest Avg.<br />
e<br />
1.5 Total Length <strong>of</strong><br />
rs<br />
a) Number <strong>of</strong> Chief Eng<strong>in</strong>eers<br />
Category b) Number <strong>of</strong> Roads <strong>of</strong> Super<strong>in</strong>tend<strong>in</strong>g Length <strong>in</strong> Eng<strong>in</strong>eers Under Construction Total (km)<br />
c) Number <strong>of</strong> Divisional km (as Eng<strong>in</strong>eers <strong>of</strong> March for 31, Execution<br />
2009) (km)<br />
4 lane roads - Prov<strong>in</strong>cial Divisions<br />
2 lane roads - Field level PIUs<br />
Intermediate d) Number lane <strong>of</strong> Sub-Divisional/Assistant Eng<strong>in</strong>eers<br />
roads<br />
e) Number <strong>of</strong> Junior Eng<strong>in</strong>eers<br />
S<strong>in</strong>gle lane roads<br />
f) Number <strong>of</strong> Divisions for ma<strong>in</strong>tenance, if<br />
Any O<strong>the</strong>r exclusively exist<strong>in</strong>g for this purpose<br />
- Comfortable ride<br />
Yes/No (Obta<strong>in</strong> copy <strong>of</strong> <strong>the</strong> latest<br />
survey, if Yes)<br />
HQ Field Total<br />
No. <strong>of</strong> accidents • Per 1,000<br />
No. <strong>of</strong> deaths<br />
vehicles<br />
No. <strong>of</strong> <strong>in</strong>juries • Per 100,000<br />
population<br />
Loss due to accidents per annum<br />
3. - Accessibility<br />
10 Personnel (cadre situation)<br />
a) Obta<strong>in</strong> a copy <strong>of</strong> <strong>the</strong> latest pay scales and<br />
1. 8 Total obta<strong>in</strong> Length a copy <strong>of</strong> <strong>of</strong> Network, ‘Cadre and Category Recruitment -wise Rules<br />
<strong>of</strong> <strong>the</strong> PWD’ (or equivalent) if exist<strong>in</strong>g.<br />
-<br />
b)<br />
Traffic<br />
Describe<br />
Growth<br />
government policy on recruitment at<br />
Junior , Assistant and Executive Eng<strong>in</strong>eer levels<br />
1. 9 Please<br />
and its<br />
obta<strong>in</strong><br />
implementation.<br />
an abstract <strong>of</strong> <strong>the</strong> latest traffic volume on SHs and MDRs or any o<strong>the</strong>r traffic<br />
data,<br />
c) Does<br />
e.g.<br />
<strong>the</strong><br />
, total<br />
state<br />
registered<br />
have an<br />
vehicle<br />
outsourc<strong>in</strong>g<br />
<strong>in</strong> <strong>the</strong><br />
policy<br />
state<br />
for<br />
or total vehicles on <strong>the</strong> road, etc., available<br />
recruit<strong>in</strong>g contract workers / specialists<br />
* If functions M<strong>in</strong>imum Age (years) Tenure<br />
d) When<br />
<strong>of</strong> roads<br />
was<br />
and<br />
<strong>the</strong><br />
o<strong>the</strong>r<br />
last recruitment<br />
sector are comb<strong>in</strong>ed,<br />
done at JE/AE<br />
please specify.<br />
1.10 Number <strong>of</strong> total permanent traffic count stations on <strong>the</strong> qualify<strong>in</strong>g network.<br />
level? Give details.<br />
service<br />
1.11<br />
e) Describe<br />
Number <strong>of</strong><br />
steps<br />
automated<br />
taken by<br />
traffic<br />
government<br />
count stations<br />
for career<br />
on <strong>the</strong> network<br />
for next<br />
(if any)<br />
(Average<br />
Max. Ave.<br />
progression<br />
level<br />
years)<br />
f) Average age and tenure <strong>of</strong> <strong>of</strong>ficers (refer to table) (years)<br />
1.12 When (year) <strong>the</strong>ir location was reassessed?<br />
95<br />
− Technical head <strong>of</strong> organization<br />
1.13 What is <strong>the</strong> strategy and frequency <strong>of</strong> traffic data collection?<br />
− Chief Eng<strong>in</strong>eer