06.08.2013 Views

A Review of Highway Agencies in the South Asia Region

A Review of Highway Agencies in the South Asia Region

A Review of Highway Agencies in the South Asia Region

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A <strong>Review</strong> <strong>of</strong> <strong>Highway</strong> <strong>Agencies</strong> <strong>in</strong> <strong>the</strong> <strong>South</strong> <strong>Asia</strong> <strong>Region</strong><br />

Table A11: Indicative distribution <strong>of</strong> marks for each <strong>in</strong>dicator<br />

National/<br />

Prov<strong>in</strong>cial<br />

Road<br />

Corporation<br />

National/Prov<strong>in</strong>cial or<br />

Rural Road Agency<br />

Indicator Unit<br />

S.<br />

No<br />

Performance<br />

Measure/<br />

Objective /<br />

Outcome/<br />

Output<br />

Category<br />

Upper<br />

Range<br />

Lower<br />

Range<br />

1 A clear vision/mission statement exists (Yes / No) 0.5 1.0 0.5<br />

1a If Yes, please provide <strong>the</strong> statement below<br />

2 Existence <strong>of</strong> Various Acts / Policy<br />

2a Road Sector Policy / Strategy <strong>in</strong> Place (Yes / No) 0.5 1.0 0.5<br />

2b <strong>Highway</strong> Act (Yes / No) 0.5 1.0 0.5<br />

2c PPP/Toll Policy (Yes / No) 0.5 1.0 0.5<br />

A clear<br />

mandate/scope<br />

and sound<br />

Legal and<br />

Regulatory<br />

Framework<br />

Exists<br />

Mandate,<br />

Policy and<br />

Legal<br />

Framework<br />

2d SHE Policy (Yes / No) 0.5 1.0 0.5<br />

2e Road Fund Act (Yes / No) 0.5 1.0 0.5<br />

2f Control <strong>of</strong> Land and Traffic Act (Yes / No) 0.5 1.0 0.5<br />

87<br />

2g Infrastructure Development Act (Yes / No) 0.5 1.0 0.5<br />

2h Urban Plann<strong>in</strong>g Act (Yes / No) 0.5 1.0 0.5<br />

2i Road Safety Policy and Strategy Exist (Yes / No) 0.5 1.0 0.5<br />

Sub total for Mandate, Policy and Legal Framework 5.0 10.0 5.0<br />

3 Preparation <strong>of</strong> Investment Plans<br />

3a A long-term master plan (10 to 15 years) exists (Yes / No) 0.5 1.0 1.0<br />

(Yes / No) 0.5 1.0 1.0<br />

3b Three/five year road sector <strong>in</strong>vestment plan has been prepared<br />

Agency has<br />

sound plann<strong>in</strong>g<br />

processes <strong>in</strong><br />

place<br />

Plann<strong>in</strong>g<br />

3c Annual plans/programs are prepared (Yes / No) 0.5 1.0 1.0<br />

4 Asset Management<br />

(Yes / No) 0.5 1.0 1.0<br />

4a Road <strong>in</strong>ventory for <strong>the</strong> entire road network is available and<br />

updated regularly<br />

4b Road <strong>in</strong>formation system / ma<strong>in</strong>tenance management system (Yes / No) 1.0 2.0 2.0<br />

established and data updated regularly.<br />

4c Traffic census are conducted regularly (Yes / No) 1.0 2.0 2.0<br />

5 Ratio <strong>of</strong> Allocated budget vs. Required<br />

Percent 0.5 1.0 1.0<br />

5a Plan (development/capital works/new construction)<br />

5b Non-plan (operation and ma<strong>in</strong>tenance)<br />

Percent 0.5 1.0 1.0<br />

Sub Total for Plann<strong>in</strong>g 5.0 10.0 10.0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!