10.08.2013 Views

Proceedings - Balai Penelitian Tanah

Proceedings - Balai Penelitian Tanah

Proceedings - Balai Penelitian Tanah

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 10. Broadband seismic (160) and accelerometer (500)<br />

10<br />

2.4. Tide Gauge Network (Bakosurtanal)<br />

Harjadi PJP<br />

Bakosurtanal plans to install 80 Tide Gauges for the InaTEWS, up to<br />

present 9 tide gauges are already installed and the data transmitted<br />

near real time via GTS. The data that are already received in BMG<br />

Operational Center are 4 of 9 with 15 minutes delay. List of<br />

commitment from contributor appears at the table below.<br />

Figure 11. Indonesia real time sea level network<br />

Source: Bakosurtanal<br />

The 30 stations supported by the Government of Indonesia will be<br />

installed in 2007 using VSAT IP communications, which means the<br />

data will be available in real time to Bakosurtanal. The data will be<br />

sent to InaTEWS Centre in BMG using VPN and will be back up with<br />

VSAT. It is expected that the installation can be carried out as<br />

scheduled. The map of the network appears at the previous page<br />

under the Sea level network.<br />

International Workshop on Post Tsunami Soil Management, 1-2 July 2008 in Bogor, Indonesia

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!