16.08.2013 Views

The role of contractual arrangements in improving health sector ...

The role of contractual arrangements in improving health sector ...

The role of contractual arrangements in improving health sector ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bahra<strong>in</strong><br />

<strong>in</strong> Bahra<strong>in</strong> or <strong>in</strong> the region to attend to calls; provision <strong>of</strong> replacement equipment <strong>in</strong> certa<strong>in</strong><br />

cases until the equipment is repaired; and carry<strong>in</strong>g out preventive service every quarter.<br />

Clarity <strong>of</strong> bidd<strong>in</strong>g and selection process<br />

<strong>The</strong> M<strong>in</strong>istry publishes the tender <strong>in</strong> local newspapers <strong>in</strong> both Arabic and English.<br />

Through this advertisement, the contractors are asked to collect tender documents (on<br />

payment <strong>of</strong> stipulated fee) from the M<strong>in</strong>istry. A clos<strong>in</strong>g date for submission <strong>of</strong> bids by the<br />

contractor is stated <strong>in</strong> the advertisement, which also gives the date and time <strong>of</strong> open<strong>in</strong>g the<br />

tender and <strong>in</strong>vites the contractors to attend the open<strong>in</strong>g <strong>of</strong> bids. <strong>The</strong> contractors can seek<br />

further <strong>in</strong>formation and clarification <strong>in</strong> writ<strong>in</strong>g. Responses to queries by any contractor are<br />

sent to all contractors who bought the tender documents.<br />

Contractor selection process<br />

After the advertisement is placed, the follow<strong>in</strong>g steps are taken.<br />

Bids are accepted <strong>in</strong> a sealed envelope at the M<strong>in</strong>istry and F<strong>in</strong>ance and National Economy and<br />

National Economy on behalf <strong>of</strong> the Tender Board until the clos<strong>in</strong>g date.<br />

<strong>The</strong> day after the clos<strong>in</strong>g date, the bids are opened by the Tender Board <strong>in</strong> the presence <strong>of</strong><br />

bidders.<br />

All the bids are listed on a display board show<strong>in</strong>g the price quoted by each bidder.<br />

Each page <strong>of</strong> these bids is stamped and punched with the Government logo so that no pages can<br />

be added later.<br />

All the bids are handed over to the contract<strong>in</strong>g M<strong>in</strong>istry, i.e. the M<strong>in</strong>istry <strong>of</strong> Health <strong>in</strong> this case,<br />

for evaluation.<br />

<strong>The</strong> bids are carefully studied by the Directorate <strong>of</strong> Medical Equipment for completeness and to<br />

determ<strong>in</strong>e whether the bids meet the M<strong>in</strong>istry <strong>of</strong> Health specifications.<br />

<strong>The</strong> f<strong>in</strong>d<strong>in</strong>gs are then presented to the Tender Evaluation Committee, which comprises members<br />

<strong>of</strong> the Directorate <strong>of</strong> F<strong>in</strong>ance, Directorate <strong>of</strong> Materials Management and Directorate <strong>of</strong><br />

Medical Equipment.<br />

<strong>The</strong> committee makes f<strong>in</strong>al recommendation for award <strong>of</strong> the contract to a bidder. Various<br />

factors considered by this committee <strong>in</strong>clude prices quoted, ability <strong>of</strong> the contractor to<br />

meet requirements, contractor’s past history <strong>of</strong> reliability, M<strong>in</strong>istry’s past experience with<br />

the contractor etc.<br />

<strong>The</strong> recommendation <strong>of</strong> the Tender Evaluation Committee is then sent to the M<strong>in</strong>ister <strong>of</strong> Health<br />

for approval. Once it is approved by the M<strong>in</strong>ister, the award <strong>of</strong> contract is sent to the<br />

Tender Board for their f<strong>in</strong>al approval. After receiv<strong>in</strong>g the approval from the Tender Board,<br />

the contract is awarded to the selected contractor.<br />

<strong>The</strong> contract is then signed between the M<strong>in</strong>istry and the contractor.<br />

<strong>The</strong> format <strong>of</strong> the contract is standard, as approved by the M<strong>in</strong>istry and F<strong>in</strong>ance and National<br />

Economy.<br />

In both case studies, the selection was based on bid price as well as on the quality <strong>of</strong><br />

technical proposal. No scor<strong>in</strong>g criteria were used for bidders’ proposals. Involvement <strong>of</strong> an<br />

expert third party (Tender Board) ensures transparency and fairness <strong>of</strong> the selection process.<br />

60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!