12.11.2013 Views

Masoneilan Products SVI II ESD - GE Energy

Masoneilan Products SVI II ESD - GE Energy

Masoneilan Products SVI II ESD - GE Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GE</strong> <strong>Energy</strong><br />

Using the Quick Start Guide<br />

<strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> Quick Start<br />

The <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> Quick Start Guide is intended to help an experienced Field<br />

Engineer install, setup, and calibrate an <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> in the most efficient manner<br />

possible. This document provides basic installation and setup instructions and is<br />

not intended to replace the in-depth information contained in the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong><br />

Instruction Manual <strong>GE</strong>A18946. If you experience problems that are not<br />

documented in this guide refer to the <strong>Masoneilan</strong> <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> Instruction Manual<br />

SIL3, <strong>GE</strong>A18946, call your local representative, or go to<br />

www.dressermasoneilan.com. Sales offices are listed on the last page of this<br />

document<br />

Installation<br />

The steps necessary to complete the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> installation and software setup<br />

are outlined in Table 1.<br />

Table 1 <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> Installation Steps<br />

Step No. Procedure Reference<br />

1<br />

2<br />

3<br />

4<br />

5<br />

Attach mounting bracket to the<br />

actuator.<br />

Install the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> magnetic<br />

assembly (rotary valves only).<br />

Assemble the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> on the<br />

bracket that is mounted to the valve<br />

actuator.<br />

Connect the pneumatic tubing to the<br />

<strong>SVI</strong> <strong>II</strong> <strong>ESD</strong>.<br />

Connect the air supply to the <strong>SVI</strong> <strong>II</strong><br />

<strong>ESD</strong>.<br />

See page page 17 for rotary<br />

valve and page 21 for<br />

reciprocating valve instructions.<br />

See page 17 for instructions.<br />

See page 17 for rotary valve and<br />

page 21 for reciprocating valve<br />

instructions.<br />

See page 27 for instructions.<br />

See page 31 for instructions.<br />

6 Install the wiring for the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong>. See page 31 for instructions.<br />

7<br />

Connect the PST controller to the<br />

HART Control Loop segment by<br />

installing the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> wiring.<br />

See page 34 for instructions.<br />

8 Power up the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong>. See page 35 for instructions.<br />

14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!