Masoneilan Products SVI II ESD - GE Energy
Masoneilan Products SVI II ESD - GE Energy
Masoneilan Products SVI II ESD - GE Energy
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>GE</strong> <strong>Energy</strong><br />
Using the Quick Start Guide<br />
<strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> Quick Start<br />
The <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> Quick Start Guide is intended to help an experienced Field<br />
Engineer install, setup, and calibrate an <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> in the most efficient manner<br />
possible. This document provides basic installation and setup instructions and is<br />
not intended to replace the in-depth information contained in the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong><br />
Instruction Manual <strong>GE</strong>A18946. If you experience problems that are not<br />
documented in this guide refer to the <strong>Masoneilan</strong> <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> Instruction Manual<br />
SIL3, <strong>GE</strong>A18946, call your local representative, or go to<br />
www.dressermasoneilan.com. Sales offices are listed on the last page of this<br />
document<br />
Installation<br />
The steps necessary to complete the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> installation and software setup<br />
are outlined in Table 1.<br />
Table 1 <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> Installation Steps<br />
Step No. Procedure Reference<br />
1<br />
2<br />
3<br />
4<br />
5<br />
Attach mounting bracket to the<br />
actuator.<br />
Install the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> magnetic<br />
assembly (rotary valves only).<br />
Assemble the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> on the<br />
bracket that is mounted to the valve<br />
actuator.<br />
Connect the pneumatic tubing to the<br />
<strong>SVI</strong> <strong>II</strong> <strong>ESD</strong>.<br />
Connect the air supply to the <strong>SVI</strong> <strong>II</strong><br />
<strong>ESD</strong>.<br />
See page page 17 for rotary<br />
valve and page 21 for<br />
reciprocating valve instructions.<br />
See page 17 for instructions.<br />
See page 17 for rotary valve and<br />
page 21 for reciprocating valve<br />
instructions.<br />
See page 27 for instructions.<br />
See page 31 for instructions.<br />
6 Install the wiring for the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong>. See page 31 for instructions.<br />
7<br />
Connect the PST controller to the<br />
HART Control Loop segment by<br />
installing the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong> wiring.<br />
See page 34 for instructions.<br />
8 Power up the <strong>SVI</strong> <strong>II</strong> <strong>ESD</strong>. See page 35 for instructions.<br />
14