ATTACHMENT 2<br />
WASTE RESOURCE MANAGEMENT — ASSET OVERVIEW<br />
CONDITION OF KATOOMBA WASTE MANAGEMENT FACILITY<br />
Business As Usual<br />
Current<br />
10 Year Projected<br />
Comments<br />
The site has recently undergone a significant upgrade to allow for greater resource recovery and substantial reduction of waste<br />
sent to landfill: • Landfill closed and capped • Developed new Transfer Station (to sort and bale residual waste prior to transport<br />
for burial at Blaxland WMF), • Resource Recovery Platform for bulky materials, • Small vehicle resource recovery area, including<br />
re-use shed.<br />
GOOD / FAIR CONDITION<br />
100% 100%<br />
current<br />
in 10 years with<br />
available funding<br />
POOR CONDITION<br />
0% 0%<br />
current<br />
in 10 years with<br />
available funding<br />
Confidence in Data:<br />
HIGH<br />
MODERATE<br />
LOW<br />
Risks<br />
License to operate the site could be removed<br />
Changes to legislation, eg carbon pricing mechanism<br />
Inability to transfer waste for burial at Blaxland WMF<br />
Transfer Station out of operation (various causes)<br />
Site closure (fire, extreme weather events, weighbridge<br />
malfunction)<br />
Response<br />
Implement Environmental management and operational plans as<br />
per standard practice<br />
Monitor/review proposal for legislation changes—Katoomba WMF<br />
will not be liable under the Clean Energy legislation<br />
Ability to store two days of waste within the Transfer Station<br />
Implement operational and maintenance schedules as standard<br />
practice to avoid; divert all vehicles to Blaxland WMF if closure<br />
does eventuate<br />
As above<br />