ATTACHMENT 2<br />
WATER RESOURCE MANAGEMENT — ASSET OVERVIEW<br />
CONDITION OF CHANNELS<br />
Business As Usual<br />
3 Year Projected 10 Year Projected<br />
Comments<br />
Open Channel drainage assets function to manage stormwater within the standard stormwater design capacity whilst<br />
minimising impact to property and the environment. Condition data for Open Channels is not current. A key challenge<br />
is the ongoing collection of condition data in order to provide a clearer picture of asset condition.<br />
Current<br />
96% <br />
GOOD/FAIR CONDITION<br />
46% in 10 yrs. with available funding<br />
Current 46% in 10 yrs. with additional SV funding<br />
4% <br />
POOR CONDITION<br />
54% in 10 yrs. with available funding<br />
Current 54% in 10 yrs. with additional SV funding<br />
Financial Strategies Implemented<br />
3 Year Projected 10 Year Projected<br />
Risks<br />
Change in storm intensity and catchment changes can<br />
impact on the performance of drainage assets .<br />
Drainage asset failure can result in decrease in functional<br />
capacity.<br />
Response<br />
Develop and implement programs of inspection and<br />
renewal for drainage assets (subject t available funding)<br />
Implement floodplain risk management plans (FRMP).<br />
Confidence in Data:<br />
HIGH<br />
MODERATE<br />
LOW<br />
A FRMP follows on from a study of the overall catchment<br />
and identifies actions to target particular risk areas<br />
or locations identified in the Floodplain Study .<br />
23