01.06.2014 Views

CLM HD8 - Projector Central

CLM HD8 - Projector Central

CLM HD8 - Projector Central

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

16. Servicing<br />

A<br />

Image 16-13<br />

Open reservoir<br />

B<br />

3. Loosen the bleed lid a little so that air can enter and close the bleed lid again.<br />

4. Turn on the bolt so that the white indication line is in the Open area (membrane is at the bottom of the reservoir).<br />

5. Turn the bleed lid a little and take it out (B)<br />

6. Turn out the third lid using the back of the main lid.<br />

C<br />

D<br />

Image 16-14<br />

Remove third lid<br />

7. Top-up the reservoir with cooling liquid until the level is somewhat higher than the hole in the reservoir.<br />

Image 16-15<br />

Top-up reservoir<br />

8. Close the third lid again using the back of the main lid. Use a cloth to dab the residue of cooling liquid.<br />

Note: Make sure that no cooling liquid is spilled in the projector.<br />

9. Turn in the bleed lid.<br />

178 R59770057 <strong>CLM</strong> <strong>HD8</strong> 15/03/2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!