01.06.2014 Views

CLM HD8 - Projector Central

CLM HD8 - Projector Central

CLM HD8 - Projector Central

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

F. Mounting optional Carry handle<br />

B<br />

B<br />

A<br />

A<br />

C<br />

A<br />

Image F-2<br />

Mounting the stacking points<br />

2. Place a stacking point (A) in each hole.<br />

3. For the front stacking points, turn in for each a long bolt (B). For the back stacking point, turn in a short bolt (C).<br />

Image F-3<br />

Stacking points mounted<br />

F.2 Preparing the new carry handle<br />

What has to be done?<br />

The back stacking point must be removed before the carry handle can be mounted on the <strong>CLM</strong> projector. The fixation hole for the<br />

fixation bolt of the carry handle is covered by the stacking point construction.<br />

How to remove the stacking point construction<br />

1. Turn out the 4 bolts, 2 on each side. Be aware that there is a nut for each bolt on the inside of the carry handle.<br />

212 R59770057 <strong>CLM</strong> <strong>HD8</strong> 15/03/2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!