01.06.2014 Views

CLM HD8 - Projector Central

CLM HD8 - Projector Central

CLM HD8 - Projector Central

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Stacking <strong>CLM</strong> projectors<br />

4. STACKING <strong>CLM</strong> PROJECTORS<br />

Stacking of <strong>CLM</strong> projectors is only possible with optional touring kit. See "Mounting optional Carry handle",<br />

page 211 for more information.<br />

Overview<br />

• Stacking <strong>CLM</strong> projectors<br />

• Aligning stacked <strong>CLM</strong> projectors<br />

4.1 Stacking <strong>CLM</strong> projectors<br />

Preparations<br />

Install first a carry handle on the upper projector.<br />

Install at minimum the 3 locking points on the lower projector or install a complete carry handle kit.<br />

How to stack <strong>CLM</strong> projectors<br />

1. Place the projectors on top of each other. Ensure that all three interlocking pins (A) match with their corresponding interlocking<br />

sockets (B).<br />

Tip: In case of stacking projectors for a ceiling mount configuration, first turn the projectors upside down before placing the<br />

projectors on top of each other.<br />

A<br />

B<br />

Image 4-1<br />

Stacking projectors<br />

2. Attach the two projectors together by closing all three interlocking adapters as illustrated.<br />

R59770057 <strong>CLM</strong> <strong>HD8</strong> 15/03/2010 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!