57<br />

MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION<br />

( A Government of <strong>Maharashtra</strong> Undertaking )<br />

Defect Liability & Maintenance Clause<br />

1) The Contractor will have to give guarantee on stamp paper of Rs. 100/- for the<br />

work executed under the agreement for a period of 2 years from the date of<br />

completion of work. During this period of 2 Years the contractor will have to<br />

execute all repairs and damages caused due to any reason for one work executed<br />

by him under the agreement without charging any extra cost.<br />

2) The Contractor will have to maintain the work executed by him in good<br />

condition during the guarantee period.<br />

3) The Contractor will have to carryout repairing work within 8 days from the date<br />

concerned authority in<strong>form</strong>s the damages/repairs to the contractor.<br />

4) During the guarantee period, if the company/contractor’s firm gets dissolved or<br />

some new partners are introduced then the responsibility of the guarantee period<br />

will have to be borne by the new company/contractor’s firm.<br />

5) For enforcing the guarantee the security deposit 8% paid by the agency shall be<br />

released as under.<br />

i) Initial Security Deposit 3% paid in the <strong>form</strong> of D.D. shall be released along with<br />

final bill.<br />

ii) The remaining 5% security deposit recovered in cash through R.A. bills shall be<br />

released after the expiry of defect liability period of 2 years and only after the<br />

joint inspection of Executive Engineer and the representative of the contractor<br />

and if the work is found to be satisfactory and ensuing, the recovery of cost of<br />

any defects covered during the period<br />

6) If certain repairs/ damages of work are neglected by the contractor, the same<br />

shall be carried out by the department at the risk and cost of the contractor and<br />

cost of the same will be recovered from the amount of security deposit.<br />

Considering the guarantee to be offered by the contractor, it is<br />

requested that the contractor should thoroughly inspect the site of work and study<br />

the site conditions before quoting for the work.<br />

Contractor.<br />

Executive Engineer(E&M).