68<br />

7 13.00<br />

8 2.00<br />

9 7.00<br />

10 5.00<br />

11 10.00<br />

12 10.00<br />

13 20<br />

14 20<br />

15 17.1<br />

Providing and fixing hinges manufactured as per best<br />

engineering practice or as per IS wherever they apply for<br />

door & windows with necessary materials and labour costs<br />

etc. complete.<br />

D] Standard Stainless Steel hinges<br />

Providing and fixing aldrops of 16 mm diameter bars<br />

manufactured as per best engineering practice wherever they<br />

apply for doors and windows with necessary materials and<br />

labour etc. complete.<br />

D] Standard Stainless Steel make Aldrop (IS:2681-1993)<br />

Providing and fixing tower bolts 12 mm diameter as per best<br />

engineering practice con<strong>form</strong>ing to IS:204-1992 (Part I,II) for<br />

doors & windows with necessary materials and labour<br />

complete.<br />

c) Standered Stainless steel make.<br />

Providing and fixing handles manufactured as per IS:208-<br />

1992 for doors and with all materials like screws etc. and all<br />

labour complete.<br />

D) Standered Stainless steel<br />

Nos. 50.00 650.00<br />

Nos. 50.00 100.00<br />

Nos. 470.00 3290.00<br />

Nos. 34.00 170.00<br />

Providing and fixing hydraulic door closer manufactured as<br />

per best engineering practice as per IS:3564 for doors and<br />

windows with necessary materials and labour cost etc. Cum. 760.00 7600.00<br />

complete.<br />

a) Light ( for shutter weight up to 35 kg)<br />

Excavation in trenches, pits, pipe lines, foundations, column<br />

footings, walls etc. in earth’s soils of all types, gravel,<br />

sand, soft & hard murum, and boulders up to 0.03 cum.<br />

size including removing the excavated material upto a<br />

distance of 50 M beyond the edge of excavation including the<br />

initial lift of 1.5 M, stacking or spreading as directed, bailing of Cum. 140.00 1400.00<br />

sub-soil water if any preparing base for foundation etc., and<br />

back filing the excavated pit or trench using the excavated<br />

material in layers including watering and ramming as required<br />

or as directed by Engineer-In-charge, including all labour and<br />

materials complete.<br />

Providing murum bedding below pipeline and filling on the<br />

top of the pipeline with selected material in 15 to 20 cm<br />

layers including watering, ramming etc. complete. Cum. 140 2800<br />

c) With material brought by contractor from MIDC area.<br />

Providing and fixing in line & level paver blocks as specified.<br />

The paver blocks shall confirm to BS 6717 ASTM C 936 - 96<br />

including providing and preparing sand beds as specified,<br />

fixing blocks in position at site, filling the joints by jointing<br />

sand, compacting the blocks by plate vibrator including filling<br />

the side joints by m-20 grade cement concrete if required etc.<br />

complete.<br />

a) 60 mm thick (strength 35 M pa) on sand bed 30 mm thick<br />

Providing and fixing in position collapsible steel shutters<br />

with vertical channels 20 x 10 x 2 mm & braced with flat iron<br />

diagonals 20 x 5 mm size top & bottom T section 40 x 40 x 6<br />

mm size 30 mm steel pulleys complete with bolts-nuts,<br />

locking arrangements, stoppers, handles and painting of two<br />

coats of synthetic enamel over 1 coat of red oxide zinc<br />

chromate primer and 2 coats of synthetic enamel paint. All<br />

labour and materials complete.<br />

Sq.M 950.00 19000.00<br />

Sq.M 2500.00 42750.00<br />

Contractor.<br />

Executive Engineer(E&M).