behind rounding of corners at junction of wall or in plastering of masonry cornices etc. shall not be<br />
paid for.<br />
2.9 Curing : Curing shall be started 24 hours after finishing the plaster. The plaster shall be kept wet<br />
for a period of seven days. During this period, it shall be suitably protected from all damages at the<br />
contractor’s expenses by such means as the Engineer-in-charge may approve. The dates on which<br />
the plastering is done shall be legibly marked on the various sections plastered so that curing for the<br />
specified period thereafter can be watched.<br />
2.10 Precautions : Any cracks which appear in the surface and all portions which sound hollow when<br />
tapped, or are found to be soft or otherwise defective shall be cut out in rectangular shape and<br />
replastered as directed by Engineer-in-charge.<br />
When ceiling plaster is done, it shall be finished to chamfered edge at an angle at its junction with a<br />
suitable tool when plaster is being done. Similarly when the wall plaster is being done, it shall be kept<br />
separate from the ceiling plaster by a thin straight groove not deeper than 6 mm drawn with any<br />
suitable method while the plaster is green.<br />
To prevent surface cracks appearing between junction of column/beams and walls 150 mm wide<br />
chicken wire mesh should be fixed with U nails 150 mm c/c in one vertical plane should be carried out<br />
in one go. For providing and fixing chicken wire mesh with U nails, payment shall be made separately<br />
under relevant item.<br />
2.11 Item to Include : The item includes providing all materials for plastering, including transportation,<br />
royalty for material, all labour, tools and plants, machinery and equipments, staging, scaffolding,<br />
bailing out water, testing, curing and construction as per above specifications etc. complete.<br />
2.12 Mode of Measurement and Payment : The plaster area shall be measured in sqm as detailed<br />
below and shall be paid at the contract rate per sqm.<br />
Measurements :<br />
1. Length and breadth shall be measured correct to a cm and its area shall be calculated in m2<br />
correct to two places of decimal.<br />
2. Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves, or open joints in<br />
brickwork.<br />
3. The measurement of wall plaster shall be taken between the walls or partitions (the dimensions<br />
before the plaster shall be taken) for the length and from the top of the floor of skirting to the ceiling for<br />
the height. Depth of covers or cornices if any shall be deducted.<br />
4. The following shall be measured separately from wall plaster.<br />
Plaster bands 30 cm wide and under<br />
Cornice beading and architrave’s or architrave’s moulded wholly in plaster.<br />
Circular work not exceeding 6 m in radius<br />
5. Plaster over masonry pilasters will be measured and paid for as plaster only.<br />
6. A coefficient of 1.63 shall be adopted for the measurement of one side plastering on honeycomb<br />
work having 6 x 10cm opening.<br />
7. Moulded cornices and coves<br />
Length shall be measured at the centre of the girth.<br />
Moulded cornices and curves shall be paid in m2 the area being arrived at by multiplying length by the<br />
girth.<br />
Flat or weathered top to cornices when exceeding 15 cm in width shall not be included in the girth but<br />
measured with the general plaster work.<br />
Cornices, which are curved in their length, shall be measured separately.<br />
8. Exterior plastering at a height greater than 10 m from average ground level shall be measured<br />
separately in each story height. Patch plastering (in repairs) shall be measured as plastering new<br />
work, where the patch exceed 2.5 m2 extra payment being made for preparing old wall, such as<br />
dismantling old plaster, raking out the joints and cleaning the surface. Where the patch does not<br />
Contractor.<br />
Executive Engineer(E&M).