a) Sufficient sills or underpinnings, in addition to base plates, shall be provided,<br />

particularly, where scaffoldings are erected on soft grounds.<br />

b) Adjustable bases to compensate for uneven ground shall be used.<br />

c) Proper anchoring of the scaffolding/staging at reasonable intervals shall be provided in<br />

each direction with the main structure wherever available.<br />

d) Horizontal braces shall be provided to prevent the scaffolding from rocking.<br />

e) Diagonal braces shall be provided continuously from bottom to top between two<br />

adjacent rows of vertical supports.<br />

f) The scaffolding/staging shall be checked at every stage for plumb line.<br />

g) Wherever the scaffolding/staging is found to be out of plumb, it shall be dismantled and reerected<br />

afresh. Effort shall not be made to bring it in line with a physical force.<br />

h) All clamps and couplings shall be properly tightened with nuts and bolts to avoid<br />

slippage.<br />

i) Erection work of a scaffolding/staging under no circumstances shall be left totally to<br />

semiskilled of skilled workmen and shall be carried out under the supervision of contractor’s<br />

technically qualified civil engineer.<br />

For smaller works or work in remote areas, wooden ballies or bamboos may be permitted for<br />

scaffolding/staging by the Engineer-in-Charge at his sole discretion. The contractor must ensure the<br />

safety and suitability of such works as described under clause 3.5.1<br />

1.7 Embedment of Fixtures : All fixtures, pipes, conduits, holdfasts of doors and windows etc. required<br />

to be built in walls, shall be embedded in plain cement concrete of grade 1:3:6 at the required position<br />

as the work proceeds.<br />

1.8 Item to Include : Item includes supply of accepted standard IInd class bricks, all other material viz.<br />

cement, sand or fine aggregate, water; all labour; scaffolding; tools and equipment; bailing out the<br />

water, mixing of mortar, laying of the brickwork as specified above etc.. The cost of testing, the<br />

machinery hire/depreciation charges, charges for scaffolding, curing etc. are deemed to be included in<br />

the item rate for the brick work. Item also includes providing openings, fixtures, preparing soffits for<br />

beams or other elements, racking of joints on outer surface etc. upto a lift of + 5 m.<br />

1.9 Mode of Measurement and Payment : The measurement of brickwork will be on volumetric basis<br />

in cubic metre (cum). Deductions for rectangular or circular openings, shall be as per IS : 1200.<br />

Item No 23 Providing plaster in cement mortar in 1:3 without neeru finishing to concrete or masonry<br />

surface in all position including scaffolding and curing complete.<br />

a) 6 mm Thick Single Coat.<br />

2.1 General : The item pertains to providing Plaster in CM 1:3, without neeru finish to concrete or<br />

masonry surface.<br />

2.2 Material :<br />

Cement : As per item Gen/C/0.2.1.<br />

Sand : As per item Gen/C/0.2.1<br />

Neeru : Standard brand instant neeru or sanala may be used.<br />

Water : As per item Gen/C/0.2.4<br />

2.3 Cement Mortar : Cement mortar of the specified proportion of 1:3 shall be prepared as per item<br />

Gen/E/0.2.<br />

2.4 Preparation of Surface : The joints in masonry shall be raked out properly. Dust and loose mortar<br />

shall be brushed out properly. Efflorescence if any, shall be removed by brushing and scrapping. The<br />

surface shall then be thoroughly washed with water, cleaned and kept wet before plastering is<br />

commenced.<br />

2.5 Scaffolding : The contractor shall provide scaffolding required for facility of construction. Quoted<br />

rates are deemed to included the cost of scaffolding as required.<br />

Contractor.<br />

Executive Engineer(E&M).