1.11 Item to Include : The rate for this item, as per the agreement includes all labour and tools for<br />

clearing the site, marking out the excavation line outs, shoring and strutting, excavation of pits or<br />

trenches, bailing or pumping out water if not provided separately, removal of excavated material and<br />

disposal of material as directed, refilling of pits or trenches, adequate protective measures etc.<br />

Contractor shall also make the necessary arrangements for taking measurements. The rate also<br />

includes the cost of repairs due to excess excavations or slips. The item also includes payment of the<br />

damages if any, by the contractor. The disposal of the material is included within 50 m radius from the<br />

edge of excavation. The lift for excavation of 1.5 m is covered by this item. The additional lifts shall be<br />

paid under Item No.Gen/A/2. The lead beyond 50 m shall be paid extra under Item No.Gen/A/9.<br />

1.12 Mode of Measurement and Payment : The measurements of the original ground profiles at<br />

selected locations shall be taken after clearing the site. The measurements of the final excavated<br />

profile shall be taken if the excavation is less or more as directed by the Engineerin-charge or shall be<br />

measured as per drawings. Excess excavation shall be recorded but shall be paid to the limited<br />

quantity as explained above. The quantity shall be measured in cubic meters and paid at the rate as<br />

per the contract agreement.<br />

Item No 13 Providing murum bedding below pipeline and filling on the top of the pipeline with selected<br />

material in 15 to 20 cms layers including watering, ramming etc. complete.<br />

c) With material brought by contractor from MIDC area.<br />

26.1 General : This item provides for bedding below the pipelines, the material being any of the a, b, c<br />

categories as described (listed) above. The excavation for laying of pipes is not covered in this item.<br />

The work of providing murum bedding is expected to be carried out after the excavation for trenches<br />

is complete.<br />

26.2 The Work : The bedding shall be provided under the pipelines, when excavations are in soft rock,<br />

hard rock and shall be provided only in locations decided by Engineer-in-charge. Before providing<br />

murum bedding protrudes of the rock shall be cut chopped off and removed. The materials needed<br />

shall be selected <strong>form</strong> the materials available from excavation or borrowed by contractor from his own<br />

borrow areas within leads up to 5 km. Alternatively MIDC may permit the contractor to borrow the<br />

material from MIDC areas. For providing murum bedding on top of pipe line, prior permission of<br />

Engineer in Charge shall be obtained.<br />

All the provisions of item Gen/A/14 shall apply.<br />

26.3 Mode of Measurement and Payment : The measurement shall be on the basis of volume of the<br />

bedding material in cum, actually laid. The contract rate shall be on cum measurement of bedding<br />

provided & shall be paid under the respective subdivision of the item description.<br />

Item No 14 28 Providing and fixing in line and level pavement blocks in CC M-20 grade including<br />

providing and preparing sand bed of 75 mm thick fixing blocks and filling the gaps with cement mortar<br />

1:3 finishing and curing etc. complete.<br />

28.1 General : The item pertains to provide paving using pavement blocks 75 mm thick of<br />

approved size with necessary sand bedding.<br />

28.2 Material : The pavement blocks shall be manufactured of M-20 C.C. The blocks shall be<br />

manufactured of approved size and shape. The moulds for blocks shall be prepared as per approved<br />

size and shape of blocks to be provided of moulds shall be having depth 80 mm. The blocks shall be<br />

cast in M-20 grade C.C. using plate vibrator so to have dense blocks. The lower 60 mm shall be<br />

natural normal cement concrete and upper 15 mm layer shall be adding approved coloured cement of<br />

approved shade in concrete mix with white cement. The blocks shall be compressed using hydraulic<br />

press so that the same shall be dense without any voids. Alternatively blocks shall be compressed<br />

using vaccume press.<br />

Contractor.<br />

Executive Engineer(E&M).