11.10.2014 Views

b-1 tender form - Maharashtra Industrial Development Corporation

b-1 tender form - Maharashtra Industrial Development Corporation

b-1 tender form - Maharashtra Industrial Development Corporation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

65<br />

18. Electric Connection and Telephone lines: All installations such as electric<br />

cables, telephones wires, water lines, sewer lines, manholes, natural drainage,<br />

CD works, storm water drains etc. coming in the way shall be looked after<br />

carefully. The protection and support against any damage, which otherwise will<br />

have to be made by the contractor at his own cost.<br />

19. Strength of Labour : The contractor shall submit weekly report to the Deputy<br />

Engineer, regarding strength of labour both skilled and unskilled employed by<br />

him on the work in pro<strong>form</strong>a as prescribed by the contractor from time to time,<br />

as the special type of work demands.<br />

20. Progress of work : The contractor shall complete the work as per direction of<br />

Engineer in charge as per programme prefix with Deputy Engineer and the<br />

Executive Engineer (E&M).<br />

If the contractor fails to complete the work as per this condition the<br />

contactor is liable for action under clause 2 of the contact.<br />

Contractor.<br />

Executive Engineer(E&M).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!