63<br />
the contractor who shall be responsible for making all payment due under the<br />
Act in case of accident.<br />
7. Petty items : All petty items occurring in the works and as found necessary shall<br />
be carried out as per standard specification book No. 1 and II as per the orders of<br />
Executive Engineer (E&M) or his representative.<br />
8. Damages to Public Property : The contractor is expected to carry out the work<br />
in such a manner as not to cause any damage to the public property. Increase<br />
any damage occurs to public property on account of negligence or otherwise by<br />
the contractor, he shall be fully responsible for making good the damages caused<br />
by him entirely at his cost.<br />
9. Safety of materials and recoveries : The contractor shall use the materials<br />
supplied to him by the department at free of cost very properly and<br />
economically. The contractor shall be responsible for proper handling and safe<br />
custody of materials so issued to him. The materials remaining unused after<br />
completion of work shall be returned by the contractor at the department’s store<br />
as directed. The department will accept only such materials as are in perfect<br />
condition. If any of the materials issued to the contractor are found<br />
short/damaged the cost therefore shall be recovered from the contractor at<br />
double the rate which it was purchased by the Department or the market rate<br />
prevailing, at that time, whichever is higher. The contractor shall maintain a day<br />
to day account of materials issued to him by the department and shall produce it<br />
to the Engineer in charge.<br />
10. Water supply : The contractor will make his own arrangements for water<br />
required for constructing purpose. However, if possible, required quantity of<br />
water for the purpose of construction and day to day use of labour etc. will be<br />
made available from the existing MIDC system. Necessary water connection will<br />
be given by MIDC as per water supply rules and regulations and all cost of<br />
materials and labours for providing and laying the lines and providing adequate<br />
storage etc are to be borne by the contractor. Water supply will be made<br />
available, if possible at the rate fixed by MIDC from time to time and these<br />
charges shall be paid monthly by the contractor.<br />
Contractor.<br />
Executive Engineer(E&M).