Mitigation for the Construction and Operation of Libby Dam
Mitigation for the Construction and Operation of Libby Dam
Mitigation for the Construction and Operation of Libby Dam
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Figure 47. Minimal detectible difference <strong>for</strong> EPT Taxa Richness <strong>for</strong> <strong>Libby</strong> Creek. This graph<br />
assumes a= 0.05, <strong>and</strong> b=0.1. With three replicates, <strong>the</strong> EPT richness must increase from 25 to<br />
> 37 <strong>for</strong> <strong>the</strong> change to be statistically significant.<br />
114