26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 48. Minimal detectible difference <strong>for</strong> Taxa Richness <strong>for</strong> <strong>the</strong> Grave Creek Phase I<br />

Restoration Project. This graph assumes a= 0.05, <strong>and</strong> b=0.1. With three replicates, <strong>the</strong> taxa<br />

richness must increase from 33 to >41 <strong>for</strong> <strong>the</strong> change to be statistically significant. Similarly,<br />

if 20 samples are collected each year, a change from 33 to 36 taxa becomes statistically<br />

significant.<br />

115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!