26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 4. The top cross sectional survey <strong>of</strong> <strong>Libby</strong> Creek (#12C) was surveyed by Montana<br />

FWP in 1999, <strong>and</strong> is typical representation <strong>of</strong> <strong>the</strong> braided channel <strong>and</strong> large amounts <strong>of</strong><br />

deposition within <strong>the</strong> floodplain <strong>of</strong> <strong>the</strong> upper <strong>Libby</strong> Creek Clevel<strong>and</strong> Project site. The lower<br />

figure characterizes <strong>the</strong> design criteria used to implement project construction activities at<br />

this site.<br />

129

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!