26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 10. Average catch per net <strong>for</strong> 12 different fish species* captured in sinking gillnets set during spring in <strong>the</strong> Rex<strong>for</strong>d area <strong>of</strong><br />

<strong>Libby</strong> Reservoir, 1990 through 2003.<br />

YEAR<br />

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003<br />

Surface Temperature 11.7 9.8 16.7 14.4 13.3 13.5 8.9<br />

Date 5/10 5/16 5/5 5/17 5/16 5/8 5/12 5/12 5/11 5/17 5/14 5/15 5/13 5/13<br />

Number <strong>of</strong> Sinking Nets 27 28 28 28 28 28 28 28 27 28 14 14 14 14<br />

Reservoir Elevation 2358 2330 2333 2352 2405 2386 2365 2350 2417 2352 2371 2392 2384 2417<br />

Average number <strong>of</strong> fish caught per net <strong>for</strong> individual fish species<br />

RBT 0.1 0.1 0.1 0.3 0.2 0.2 0.7 0.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!