Mitigation for the Construction and Operation of Libby Dam
Mitigation for the Construction and Operation of Libby Dam
Mitigation for the Construction and Operation of Libby Dam
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 2. Summary in<strong>for</strong>mation <strong>for</strong> <strong>the</strong> baited hoop trapping ef<strong>for</strong>t <strong>for</strong> burbot on <strong>Libby</strong> Reservoir. Montana FWP used 2 types <strong>of</strong><br />
tags to investigate <strong>the</strong> life history <strong>of</strong> burbot <strong>for</strong> this study; acoustic (A) <strong>and</strong> combined radio/acoustic tags (C).<br />
Sample Site River<br />
Mile<br />
Dates Trapped Total<br />
Trap-<br />
Days<br />
Total<br />
Burbot<br />
Catch<br />
Catch per Catch per Tags Released<br />
Trap-Day 1 Trap-Day 2<br />
Canyon Crk. 222.5 1/12 – 3/25 219 16 0.073 0.063 2-C<br />
Cripple Horse 226.8 11/14 – 1/12 177 17 0.096 0.102 11-A<br />
Crk.<br />
Barron Crk. 228.7 2/27 – 4/26 177 11 0.062 0.076 0<br />
Bristow Crk. 231.5 1/12 - 2/27 138 7 0.051 0.054 1-A & 2-C<br />
Ten Mile Crk. 235.8 1/16 – 3/25 195 10 0.051 0.047 1-A & 2-C<br />
Big Crk. 248.7 11/14 – 1/16 193 12 0.062 0.076 7-A<br />
Sutton Crk. 250.3 1/16 – 4/26 291 24 0.082 0.084 2-C<br />
Dodge Crk. 264.1 11/14 – 12/16 96 0 0 0 0<br />
254 20 0.079 0.067 4-A & 2-C<br />
Tobacco River 264.0 11/14 – 1/13<br />
&<br />
3/25/04 – 4/26/04<br />
Young Crk. 268.4 12/16 – 1/2/04<br />
&<br />
3/25/04 – 4/26/04<br />
147 10 0.068 0.072 4-A & 2-C<br />
Total / Mean 1887 127 0.062 0.064 28-A & 12-C<br />
1 Average burbot catch per trap-day calculated as <strong>the</strong> average catch <strong>for</strong> each trap set at each sample site.<br />
2 Average burbot catch per trap-day calculated by dividing <strong>the</strong> total burbot catch by total trap-days.<br />
64