Mitigation for the Construction and Operation of Libby Dam
Mitigation for the Construction and Operation of Libby Dam
Mitigation for the Construction and Operation of Libby Dam
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Number <strong>of</strong> Burbot<br />
8<br />
7<br />
6<br />
5<br />
4<br />
3<br />
2<br />
1<br />
0<br />
0 1 2 3 4 5<br />
Number <strong>of</strong> Observations<br />
Acoustic<br />
Combo<br />
Figure 17. Histogram <strong>of</strong> <strong>the</strong> number <strong>of</strong> acoustic observations <strong>for</strong> burbot tagged with<br />
acoustic <strong>and</strong> combined radio/acoustic tags in <strong>Libby</strong> Reservoir 2003-2004.<br />
71