26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Number <strong>of</strong> Burbot<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

0<br />

0 1 2 3 4 5<br />

Number <strong>of</strong> Observations<br />

Acoustic<br />

Combo<br />

Figure 17. Histogram <strong>of</strong> <strong>the</strong> number <strong>of</strong> acoustic observations <strong>for</strong> burbot tagged with<br />

acoustic <strong>and</strong> combined radio/acoustic tags in <strong>Libby</strong> Reservoir 2003-2004.<br />

71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!