26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

140<br />

135<br />

130<br />

125<br />

120<br />

115<br />

110<br />

Elevation (ft)<br />

105<br />

100<br />

95<br />

90<br />

0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400<br />

Pr<strong>of</strong>ile Distance (ft)<br />

Thalweg Water Surface<br />

Figure 5. The longitudinal pr<strong>of</strong>ile <strong>of</strong> <strong>the</strong> existing stream channel prior to <strong>the</strong> implementation <strong>of</strong> <strong>the</strong> restoration project. The survey<br />

was conducted beginning at station 0 (upper project boundary) to approximately 2350 feet prior to <strong>the</strong> implementation <strong>of</strong> <strong>the</strong><br />

restoration project in <strong>the</strong> fall <strong>of</strong> 2002. The survey was not completed <strong>for</strong> <strong>the</strong> lower approximate third <strong>of</strong> <strong>the</strong> project area. Note <strong>the</strong><br />

lack <strong>of</strong> pool habitat within <strong>the</strong> project area.<br />

131

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!