26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

190.0<br />

185.0<br />

180.0<br />

175.0<br />

170.0<br />

165.0<br />

Elevation<br />

160.0<br />

155.0<br />

150.0<br />

145.0<br />

140.0<br />

0 500 1000 1500 2000 2500 3000 3500 4000 4500<br />

Station<br />

2002 2003 2001<br />

Figure 7. The longitudinal pr<strong>of</strong>ile <strong>for</strong> <strong>the</strong> Grave Creek Phase I Restoration Project. The survey was completed be<strong>for</strong>e (2001) <strong>and</strong><br />

after (2002; as built) project completion <strong>and</strong> after <strong>the</strong> first spring freshet (2003). The station (longitudinal location measured at <strong>the</strong><br />

channel thalweg) begins at <strong>the</strong> upstream boundary <strong>of</strong> <strong>the</strong> project.<br />

138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!