26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Number Fish per 1000 Feet<br />

160<br />

140<br />

120<br />

100<br />

80<br />

60<br />

40<br />

20<br />

0<br />

Pre Project (98-2001) Post Project (2002-2003)<br />

Year<br />

Rainbow Trout Brook Trout Bull Trout<br />

Figure 26. Rainbow trout <strong>and</strong> brook trout densities (fish per 1000 feet) within <strong>the</strong> <strong>Libby</strong><br />

Creek Demonstration Project area, comparing annual mean pre-project (1998-2001) data <strong>and</strong><br />

post-project (2002) using mobile electr<strong>of</strong>ishing gear. Upper 95% confidence intervals are<br />

represented by <strong>the</strong> whisker bars.<br />

Fish per 1,000 Feet<br />

140<br />

120<br />

100<br />

80<br />

60<br />

40<br />

20<br />

0<br />

1998 1999 2000 2001 2002 2003<br />

Year<br />

Rainbow Trout Brook Trout Bull Trout<br />

Figure 27. Rainbow trout, brook trout, <strong>and</strong> bull trout densities (fish per 1000 feet) within <strong>the</strong><br />

<strong>Libby</strong> Creek Section 1 monitoring site 1998 through 2003 using a backpack electr<strong>of</strong>isher.<br />

Upper 95% confidence intervals are represented by <strong>the</strong> whisker bars. The site was sampled<br />

using single pass electr<strong>of</strong>ishing in 1999 <strong>and</strong> 2000.<br />

per 1000 Feet<br />

250<br />

200<br />

150<br />

87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!