26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 28. Rainbow trout, brook trout, <strong>and</strong> bull trout densities (fish per 1000 feet) within <strong>the</strong><br />

<strong>Libby</strong> Creek Section 2 monitoring site sampled in 1998, 2001 <strong>and</strong> 2003 using a backpack<br />

electr<strong>of</strong>isher. Upper 95% confidence intervals are represented by <strong>the</strong> whisker bars.<br />

Number Fish per 1000 Feet<br />

200<br />

150<br />

100<br />

50<br />

0<br />

2000 2001 2002 2003<br />

Year<br />

Rainbow Trout<br />

Bull Trout<br />

Figure 29. Rainbow trout <strong>and</strong> bull trout densities (fish per 1000 feet) within <strong>the</strong> <strong>Libby</strong> Creek<br />

Section 3 monitoring site in 2000-2003 using a backpack electr<strong>of</strong>isher. Upper 95%<br />

confidence intervals are represented by <strong>the</strong> whisker bars. This site is located within <strong>the</strong><br />

upper <strong>Libby</strong> Creek restoration project area. The data from 2000-2002 represent pre-project<br />

trends <strong>of</strong> fish abundance, <strong>and</strong> <strong>the</strong> 2003 data represent data after project completion.<br />

88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!