26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table A13. Yearly mean total zooplankton densities (no./l) (top line) <strong>and</strong> variances (bottom<br />

line) estimated from 10-20 m. vertical tows made in <strong>Libby</strong> Reservoir. Epischura <strong>and</strong> Leptodora<br />

were measured as number per m 3 .<br />

Year (N) Daphnia Bosmina Diaptomus Cyclops Leptodora Epischura Diaphanosoma<br />

1997<br />

1998<br />

1999<br />

2000<br />

2001<br />

2002<br />

Mean<br />

69 2.80<br />

11.30<br />

0.07<br />

0.01<br />

0.80<br />

0.88<br />

6.10<br />

50.87<br />

4.34<br />

108.72<br />

57.24<br />

6,013.80<br />

0.08<br />

0.02<br />

72 2.17 0.64 2.22 9.35 3.99 131.58 0.36<br />

4.00 1.80 9.17 64.33 80.92 47,113.37 0.43<br />

57 2.19 0.77 0.51 9.57 6.63 89.41 0.15<br />

4.53 1.39 2.35 107.88 148.11 14,367.63 0.05<br />

69 1.07 0.51 0.36 8.04 2.72 51.20 0.05<br />

0.97 1.06 0.20 80.04 14.05 7,153.52 0.01<br />

72 1.58 0.46 0.46 8.39 2.72 63.72 0.22<br />

2.77 0.46 0.21 59.53 21.18 11,153.71 0.13<br />

56 1.82 0.65 0.39 8.89 4.88 77.96 1.02<br />

6.85 1.29 0.22 57.44 139.73 9,041.90 3.62<br />

1.94 0.52 0.79 8.39 4.21 78.52 0.31<br />

158

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!